If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0094172204020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]()  | 
| Location: 02/04-22-009-17W4/0 | |
| Location Alias: 02/04-22-09-17 W4M | |
| Location Alias 2: 02/04-22-009-17 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 009 | |
| Meridian: 4 | |
| Range: 17 | |
| Section: 22 | |
| County/Municipality: Municipal District of Taber | |
| Well Name: CNRL 102 HZ TABER 4-22-9-17 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0468869 | |
| License Date: 2014-08-07 | |
| License Status: Issued | |
| Spud Date: 2014-10-25 | |
| Final Drill Date: 2014-10-30 | |
| Well Total Depth: 1725.00 m | |
| Surface Hole Latitude: 49.750061 | |
| Surface Hole Longitude: -112.238891 | 
| Date | Event | 
|---|---|
| 2014-08-07 | Obtained License | 
| 2014-10-26 | Surface Casing Operation Performed | 
| 2014-10-27 | Direction Drilling Operation Performed - Deviate | 
| 2014-10-28 | Direction Drilling Operation Performed - Horizontal | 
| 2014-10-28 | Intermediate Casing Operation Performed | 
| 2014-10-30 | Finished Drilling | 
| 2014-10-30 | Well Log Performed | 
| 2014-10-30 | Well Mode changed to Drilled and Cased | 
| 2014-10-31 | Liner Casing Operation Performed | 
| 2014-10-31 | Perforation Treatment Performed - Open-Hole Completion | 
| 2014-10-31 | Perforation Treatment Performed - Slotted Liner or Casing | 
| 2014-10-31 | Rig Released | 
| 2014-11-26 | Well Log Performed | 
| 2014-12-01 | Well Began Production | 
| 2014-12-01 | Well Fluid changed to Crude Oil | 
| 2014-12-01 | Well Mode changed to Pumping | 
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type | 
|---|---|---|---|---|
| 2014-10-27 | Precision Drilling Corporation | 153 | N/A | Drill To LD | 
For data sources see[4]
| Start Date | Depth (m) | Reason | 
|---|---|---|
| 2014-10-27 | 692.00 | Deviate (5 - 79 degrees) | 
| 2014-10-28 | 1104.00 | Horizontal | 
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | 
|---|---|---|---|---|
| 2014-10-31 | Slotted Liner | 1142.00 | 1720.00 | 0 | 
| 2014-10-31 | Open Hole/Barefoot Completion | 1720.00 | 1725.00 | 0 | 
For data sources see[6]
 
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) | 
|---|---|---|---|---|
| 2014 | 660 | 0.0 | 0.0 | 0.0 | 
| 2015 | 8303 | 0.0 | 0.0 | 0.0 | 
| 2016 | 8489 | 0.0 | 0.0 | 0.0 | 
| 2017 | 8444 | 0.0 | 0.0 | 0.0 | 
| 2018 | 8522 | 0.0 | 0.0 | 0.0 | 
| 2019 | 8731 | 0.0 | 0.0 | 0.0 | 
| 2020 | 2180 | 0.0 | 0.0 | 0.0 | 
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) | 
|---|---|---|---|
| 2014-10-31 | No Incident Encountered | 0.00 | 0.00 | 
| 2014-12-14 | No Incident Encountered | 0.00 | 0.00 | 
For data sources see[8]