If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0094171207020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 02/07-12-009-17W4/0 | |
| Location Alias: 02/07-12-09-17 W4M | |
| Location Alias 2: 02/07-12-009-17 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 009 | |
| Meridian: 4 | |
| Range: 17 | |
| Section: 12 | |
| County/Municipality: Municipal District of Taber | |
| Well Name: SUMMIT TABER 7-12-9-17 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0144085 | |
| License Date: 1990-05-07 | |
| License Status: RecCertified | |
| Spud Date: 1990-05-11 | |
| Final Drill Date: 1990-05-16 | |
| Well Total Depth: 1005.00 m | |
| Surface Hole Latitude: 49.718442 | |
| Surface Hole Longitude: -112.180376 |
| Date | Event |
|---|---|
| 1990-05-07 | Obtained License |
| 1990-05-12 | Surface Casing Operation Performed |
| 1990-05-16 | Finished Drilling |
| 1990-05-16 | Well Log Performed |
| 1990-05-17 | Production Casing Operation Performed |
| 1990-05-17 | Rig Released |
| 1990-05-17 | Well Mode changed to Drilled and Cased |
| 1990-07-03 | Well Log Performed |
| 1990-07-04 | Perforation Treatment Performed - Jet Perforation |
| 1990-07-04 | Well Log Performed |
| 1990-09-27 | Well Began Production |
| 1990-09-27 | Well Fluid changed to Crude Oil |
| 1990-09-27 | Well Mode changed to Pumping |
| 1991-08-19 | Well Fluid changed to Crude Oil |
| 1991-08-19 | Well Mode changed to Suspended |
| 1995-07-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1995-07-26 | Plug Back Performed |
| 1995-07-26 | Well Abandoned |
| 1995-07-26 | Well Fluid changed to Crude Oil |
| 1995-07-26 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1990-07-04 | Perforation | 958.50 | 960.50 | 13 |
| 1995-07-26 | Packing Device Capped w/Cement | 935.00 | 943.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1990 | 2121 | 0.0 | 0.0 | 0.0 |
| 1991 | 4616 | 0.0 | 0.0 | 0.0 |
For data sources see[5]