X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094171207000

Well Details

Well ID: 0094171207000
Loading map...
Location: 00/07-12-009-17W4/0
Location Alias: 00/07-12-09-17 W4M
Location Alias 2: 00/07-12-009-17 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 17
Section: 12
County/Municipality: Municipal District of Taber
Well Name: SUMMIT ET AL TABER 7-12-9-17
Operator Name: Paramount Resources Ltd.
License Number: 0141377
License Date: 1989-10-18
License Status: RecCertified
Spud Date: 1989-10-20
Final Drill Date: 1989-10-24
Well Total Depth: 1015.00 m
Surface Hole Latitude: 49.717378
Surface Hole Longitude: -112.182601

For data sources see[1][2]

Well History

Date Event
1989-10-18 Obtained License
1989-10-21 Surface Casing Operation Performed
1989-10-24 Finished Drilling
1989-10-24 Well Log Performed
1989-10-24 Well Mode changed to Drilled and Cased
1989-10-25 Production Casing Operation Performed
1989-10-26 Rig Released
1990-03-09 Well Log Performed
1990-03-13 Perforation Treatment Performed - Jet Perforation
1990-04-01 Well Began Production
1990-04-01 Well Fluid changed to Crude Oil
1990-04-01 Well Mode changed to Pumping
1990-11-17 Perforation Treatment Performed - Jet Perforation
1990-11-17 Well Log Performed
1990-11-18 Perforation Treatment Performed - Cement Squeeze
1990-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-21 Perforation Treatment Performed - Chemical Squeeze
1991-08-20 Well Fluid changed to Crude Oil
1991-08-20 Well Mode changed to Suspended
1995-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-26 Plug Back Performed
1995-07-26 Well Abandoned
1995-07-26 Well Fluid changed to Crude Oil
1995-07-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-13 Perforation 958.00 961.00 13
1990-11-17 Perforation 963.70 964.00 13
1990-11-18 Cement Squeeze 963.70 964.00 0
1990-11-19 Acid Treatment 958.00 961.00 0
1990-11-21 Chemical Squeeze 958.00 961.00 0
1995-07-26 Packing Device Capped w/Cement 936.30 944.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 3603 0.0 0.0 0.0
1991 4309 0.0 0.0 0.0

For data sources see[5]

References