If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0094170914002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.724892,"lon":-112.252596,"icon":""}]} |
| Location: 00/14-09-009-17W4/2 | |
| Location Alias: 00/14-09-09-17 W4M | |
| Location Alias 2: 00/14-09-009-17 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 009 | |
| Meridian: 4 | |
| Range: 17 | |
| Section: 09 | |
| County/Municipality: Municipal District of Taber | |
| Well Name: CARDINAL NWR CO TABER 14-9-9-17 | |
| Operator Name: Cardinal Petroleum Company | |
| License Number: 0019550 | |
| License Date: 1960-08-15 | |
| License Status: RecCertified | |
| Spud Date: 1960-08-16 | |
| Final Drill Date: 1960-08-21 | |
| Well Total Depth: 989.10 m | |
| Surface Hole Latitude: 49.724892 | |
| Surface Hole Longitude: -112.252596 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1944-08-28 | Perforation Treatment Performed - Open-Hole Completion |
| 1958-11-03 | Perforation Treatment Performed - Cement Plug |
| 1960-08-15 | Obtained License |
| 1960-08-21 | Finished Drilling |
| 1960-08-21 | Perforation Treatment Performed - Open-Hole Completion |
| 1960-08-21 | Well Mode changed to Drilled and Cased |
| 1960-09-13 | Well Began Production |
| 1960-09-13 | Well Fluid changed to Crude Oil |
| 1960-09-13 | Well Mode changed to Flowing |
| 1960-09-28 | Well Log Performed |
| 1968-11-05 | Well Fluid changed to Crude Oil |
| 1968-11-05 | Well Mode changed to Suspended |
| 1972-06-19 | Perforation Treatment Performed - Cement Plug |
| 1972-06-19 | Well Abandoned |
| 1972-06-19 | Well Fluid changed to Crude Oil |
| 1972-06-19 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1944-08-28 | Open Hole/Barefoot Completion | 981.50 | 989.10 | 0 |
| 1958-11-03 | Cement Plug | 949.10 | 974.40 | 0 |
| 1960-08-21 | Open Hole/Barefoot Completion | 981.50 | 986.30 | 0 |
| 1972-06-19 | Cement Plug | 940.00 | 969.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 0 | 0.0 | 0.0 | 0.0 |
| 1968 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]