X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094163206000

Well Details

Well ID: 0094163206000
Loading map...
Location: 00/06-32-009-16W4/0
Location Alias: 00/06-32-09-16 W4M
Location Alias 2: 00/06-32-009-16 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 16
Section: 32
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 6-32-9-16
Operator Name: Canadian Natural Resources Limited
License Number: 0068113
License Date: 1978-01-27
License Status: Abandoned
Spud Date: 1978-06-22
Final Drill Date: 1978-07-02
Well Total Depth: 1011.00 m
Surface Hole Latitude: 49.774902
Surface Hole Longitude: -112.143978

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-01-27 Obtained License
1978-06-22 Direction Drilling Operation Performed - 98
1978-06-22 Lost Circulation Occurred
1978-07-02 Finished Drilling
1978-07-02 Well Mode changed to Drilled and Cased
1978-07-04 Production Casing Operation Performed
1978-08-19 Perforation Treatment Performed - Bullet Perforation
1978-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-29 Well Began Production
1978-10-29 Well Fluid changed to Crude Oil
1978-10-29 Well Mode changed to Pumping
2012-03-27 Well Fluid changed to Crude Oil
2012-03-27 Well Mode changed to Suspended
2013-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-08-12 Perforation Treatment Performed - Cement Plug
2013-08-12 Perforation Treatment Performed - Remedial Casing
2013-08-14 Well Log Performed
2013-08-15 Perforation Treatment Performed - Jet Perforation
2013-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-08-18 Perforation Treatment Performed - Cement Plug
2013-08-18 Perforation Treatment Performed - Remedial Casing
2013-08-20 Well Log Performed
2013-08-23 Perforation Treatment Performed - Jet Perforation
2013-08-23 Well Log Performed
2013-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-08-26 Perforation Treatment Performed - Cement Plug
2013-08-26 Perforation Treatment Performed - Remedial Casing
2013-08-26 Plug Back Performed
2013-08-26 Well Fluid changed to Crude Oil
2013-08-26 Well Mode changed to Abandoned Zone
2014-01-31 Well Abandoned
2014-01-31 Well Fluid changed to Crude Oil
2014-01-31 Well Mode changed to Abandoned
2015-05-29 Well Log Performed
2015-05-30 Perforation Treatment Performed - Jet Perforation
2015-05-30 Well Log Performed
2015-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-06-09 Perforation Treatment Performed - Remedial Casing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1978-06-22 293.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-08-19 Bullet Perforation 1000.00 1005.50 7
2013-08-16 Acid Treatment 688.50 691.50 0
2013-08-18 Remedial Casing Cementing 688.50 691.50 0
2013-08-18 Cement Plug 684.00 691.50 0
2013-08-18 Packing Device Capped w/Cement 675.70 684.00 0
2013-08-23 Perforation 303.20 306.20 17
2013-08-23 Perforation 303.20 306.20 20
2013-08-25 Acid Treatment 303.20 306.20 0
2013-08-26 Remedial Casing Cementing 303.20 306.20 0
2013-08-26 Cement Plug 298.70 306.20 0
2013-08-26 Packing Device Capped w/Cement 289.80 298.70 0
1978-08-19 Bullet Perforation 996.40 998.20 7
2015-05-30 Perforation 840.20 843.20 17
2015-05-30 Perforation 840.20 843.20 20
2015-06-01 Acid Treatment 840.20 843.20 0
2015-06-03 Acid Treatment 840.20 843.20 0
2015-06-09 Remedial Casing Cementing 840.20 843.20 0
2015-06-09 Packing Device Capped w/Cement 822.00 833.00 0
1978-08-19 Bullet Perforation 994.60 995.50 7
1978-08-21 Acid Treatment 994.60 1005.50 0
2013-08-10 Acid Treatment 994.60 1005.50 0
2013-08-12 Remedial Casing Cementing 994.60 1005.50 0
2013-08-12 Cement Plug 956.10 1007.00 0
2013-08-15 Perforation 688.50 691.50 17
2013-08-15 Perforation 688.50 691.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 2164 0.0 0.0 0.0
1979 5360 0.0 0.0 0.0
1980 8582 0.0 0.0 0.0
1981 8543 0.0 0.0 0.0
1982 7374 0.0 0.0 0.0
1983 8633 0.0 0.0 0.0
1984 8431 0.0 0.0 0.0
1985 8219 0.0 0.0 0.0
1986 8639 0.0 0.0 0.0
1987 8621 0.0 0.0 0.0
1988 8005 0.0 0.0 0.0
1989 8016 0.0 0.0 0.0
1990 8192 0.0 0.0 0.0
1991 8569 0.0 0.0 0.0
1992 8642 0.0 0.0 0.0
1993 8175 0.0 0.0 0.0
1994 8751 0.0 0.0 0.0
1995 8659 0.0 0.0 0.0
1996 8769 0.0 0.0 0.0
1997 8751 0.0 0.0 0.0
1998 8755 0.0 0.0 0.0
1999 8729 0.0 0.0 0.0
2000 8527 0.0 0.0 0.0
2001 8756 0.0 0.0 0.0
2002 8753 0.0 0.0 0.0
2003 8705 0.0 0.0 0.0
2004 8764 0.0 0.0 0.0
2005 8726 0.0 0.0 0.0
2006 8006 0.0 0.0 0.0
2007 7677 0.0 0.0 0.0
2008 8755 0.0 0.0 0.0
2009 8738 0.0 0.0 0.0
2010 8732 0.0 0.0 0.0
2011 2855 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-06-22 Lost Circulation 125.00 125.00
2013-08-28 No Incident Encountered 0.00 0.00
2015-06-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References