X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094162015020

Well Details

Well ID: 0094162015020
Loading map...
Location: 02/15-20-009-16W4/0
Location Alias: 02/15-20-09-16 W4M
Location Alias 2: 02/15-20-009-16 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 16
Section: 20
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 15-20-9-16
Operator Name: Canadian Natural Resources Limited
License Number: 0075182
License Date: 1979-04-09
License Status: Abandoned
Spud Date: 1979-07-01
Final Drill Date: 1979-07-11
Well Total Depth: 1026.00 m
Surface Hole Latitude: 49.754814
Surface Hole Longitude: -112.137449

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-04-09 Obtained License
1979-07-01 Direction Drilling Operation Performed - 98
1979-07-11 Finished Drilling
1979-07-11 Well Mode changed to Drilled and Cased
1979-07-12 Production Casing Operation Performed
1979-07-22 Perforation Treatment Performed - Jet Perforation
1979-11-16 Well Began Production
1979-11-16 Well Fluid changed to Crude Oil
1979-11-16 Well Mode changed to Pumping
1987-10-19 Well Log Performed
1988-04-01 Well Fluid changed to Crude Oil
1988-04-01 Well Mode changed to Suspended
1989-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-07-14 Perforation Treatment Performed - Jet Perforation
1989-07-14 Plug Back Performed
1989-07-14 Well Fluid changed to Crude Oil
1989-07-14 Well Mode changed to Abandoned
1989-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-15 Perforation Treatment Performed - Remedial Casing
1989-07-18 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1979-07-01 400.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-22 Perforation 981.00 982.70 13
1979-07-22 Perforation 983.30 990.00 13
1979-07-22 Perforation 990.70 992.00 13
1989-07-14 Packing Device Capped w/Cement 968.00 976.00 0
1989-07-14 Perforation 190.00 190.50 13
1989-07-15 Acid Treatment 190.00 190.50 0
1989-07-15 Remedial Casing Cementing 190.00 190.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 411 0.0 0.0 0.0
1980 1532 0.0 0.0 0.0
1981 2031 0.0 0.0 0.0
1982 2898 0.0 0.0 0.0
1983 7186 0.0 0.0 0.0
1984 8631 0.0 0.0 0.0
1985 8556 0.0 0.0 0.0
1986 8497 0.0 0.0 0.0
1987 4234 0.0 0.0 0.0

For data sources see[6]

References