If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0094162015020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 02/15-20-009-16W4/0 | |
Location Alias: 02/15-20-09-16 W4M | |
Location Alias 2: 02/15-20-009-16 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 4 | |
Range: 16 | |
Section: 20 | |
County/Municipality: Municipal District of Taber | |
Well Name: CNRL TABER 15-20-9-16 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0075182 | |
License Date: 1979-04-09 | |
License Status: Abandoned | |
Spud Date: 1979-07-01 | |
Final Drill Date: 1979-07-11 | |
Well Total Depth: 1026.00 m | |
Surface Hole Latitude: 49.754814 | |
Surface Hole Longitude: -112.137449 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-04-09 | Obtained License |
1979-07-01 | Direction Drilling Operation Performed - 98 |
1979-07-11 | Finished Drilling |
1979-07-11 | Well Mode changed to Drilled and Cased |
1979-07-12 | Production Casing Operation Performed |
1979-07-22 | Perforation Treatment Performed - Jet Perforation |
1979-11-16 | Well Began Production |
1979-11-16 | Well Fluid changed to Crude Oil |
1979-11-16 | Well Mode changed to Pumping |
1987-10-19 | Well Log Performed |
1988-04-01 | Well Fluid changed to Crude Oil |
1988-04-01 | Well Mode changed to Suspended |
1989-07-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-07-14 | Perforation Treatment Performed - Jet Perforation |
1989-07-14 | Plug Back Performed |
1989-07-14 | Well Fluid changed to Crude Oil |
1989-07-14 | Well Mode changed to Abandoned |
1989-07-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-07-15 | Perforation Treatment Performed - Remedial Casing |
1989-07-18 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1979-07-01 | 400.00 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-07-22 | Perforation | 981.00 | 982.70 | 13 |
1979-07-22 | Perforation | 983.30 | 990.00 | 13 |
1979-07-22 | Perforation | 990.70 | 992.00 | 13 |
1989-07-14 | Packing Device Capped w/Cement | 968.00 | 976.00 | 0 |
1989-07-14 | Perforation | 190.00 | 190.50 | 13 |
1989-07-15 | Acid Treatment | 190.00 | 190.50 | 0 |
1989-07-15 | Remedial Casing Cementing | 190.00 | 190.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 411 | 0.0 | 0.0 | 0.0 |
1980 | 1532 | 0.0 | 0.0 | 0.0 |
1981 | 2031 | 0.0 | 0.0 | 0.0 |
1982 | 2898 | 0.0 | 0.0 | 0.0 |
1983 | 7186 | 0.0 | 0.0 | 0.0 |
1984 | 8631 | 0.0 | 0.0 | 0.0 |
1985 | 8556 | 0.0 | 0.0 | 0.0 |
1986 | 8497 | 0.0 | 0.0 | 0.0 |
1987 | 4234 | 0.0 | 0.0 | 0.0 |
For data sources see[6]