If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0094162012050 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.749876,"lon":-112.147565,"icon":""}]} |
| Location: 05/12-20-009-16W4/0 | |
| Location Alias: 05/12-20-09-16 W4M | |
| Location Alias 2: 05/12-20-009-16 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 009 | |
| Meridian: 4 | |
| Range: 16 | |
| Section: 20 | |
| County/Municipality: Municipal District of Taber | |
| Well Name: CNRL TABER 12-20-9-16 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0193252 | |
| License Date: 1996-11-07 | |
| License Status: Issued | |
| Spud Date: 1996-11-28 | |
| Final Drill Date: 1996-12-05 | |
| Well Total Depth: 1075.00 m | |
| Surface Hole Latitude: 49.749876 | |
| Surface Hole Longitude: -112.147565 |
| Date | Event |
|---|---|
| 1996-11-07 | Obtained License |
| 1996-11-30 | Direction Drilling Operation Performed - Deviate |
| 1996-11-30 | Surface Casing Operation Performed |
| 1996-12-05 | Finished Drilling |
| 1996-12-05 | Well Log Performed |
| 1996-12-05 | Well Mode changed to Drilled and Cased |
| 1996-12-06 | Production Casing Operation Performed |
| 1996-12-06 | Rig Released |
| 1996-12-19 | Perforation Treatment Performed - Jet Perforation |
| 1996-12-22 | Well Began Production |
| 1996-12-22 | Well Fluid changed to Crude Oil |
| 1996-12-22 | Well Mode changed to Pumping |
| 1997-01-14 | Well Log Performed |
| 1998-09-17 | Well Fluid changed to Crude Oil |
| 1998-09-17 | Well Mode changed to Suspended |
| 1998-10-28 | Well Log Performed |
| 1998-10-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-10-29 | Perforation Treatment Performed - Jet Perforation |
| 1998-10-29 | Plug Back Performed |
| 1998-10-29 | Well Fluid changed to Crude Oil |
| 1998-10-29 | Well Mode changed to Abandoned Zone |
| 1998-11-02 | Perforation Treatment Performed - Fractured |
| 1998-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-11-04 | Perforation Treatment Performed - Jet Perforation |
| 1998-11-04 | Plug Back Performed |
| 2006-12-09 | Perforation Treatment Performed - Cement Squeeze |
| 2006-12-11 | Perforation Treatment Performed - Jet Perforation |
| 2006-12-12 | Perforation Treatment Performed - Cement Squeeze |
| 2006-12-12 | Plug Back Performed |
| 2006-12-14 | Perforation Treatment Performed - Jet Perforation |
| 2006-12-16 | Perforation Treatment Performed - Jet Perforation |
| 2006-12-16 | Well Log Performed |
| 2007-03-21 | Well Fluid changed to Crude Oil |
| 2007-03-21 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1996-11-30 | 339.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1996-12-19 | Perforation | 1030.00 | 1031.50 | 13 |
| 1998-11-04 | Perforation | 646.00 | 647.00 | 13 |
| 2006-12-09 | Cement Squeeze | 646.00 | 647.00 | 0 |
| 2006-12-11 | Perforation | 702.00 | 703.00 | 13 |
| 2006-12-12 | Cement Squeeze | 702.00 | 703.00 | 0 |
| 2006-12-14 | Perforation | 1005.00 | 1007.00 | 13 |
| 2006-12-14 | Perforation | 1008.50 | 1009.50 | 13 |
| 2006-12-14 | Perforation | 1017.00 | 1020.00 | 13 |
| 2006-12-14 | Perforation | 1021.50 | 1023.00 | 13 |
| 2006-12-16 | Perforation | 1024.00 | 1027.00 | 20 |
| 1996-12-19 | Perforation | 1017.00 | 1020.00 | 13 |
| 1996-12-19 | Perforation | 1021.50 | 1023.00 | 13 |
| 1996-12-19 | Perforation | 1005.00 | 1007.00 | 13 |
| 1996-12-19 | Perforation | 1008.50 | 1009.50 | 13 |
| 1998-10-29 | Packing Device Capped w/Cement | 995.00 | 1003.00 | 0 |
| 1998-10-29 | Perforation | 702.00 | 703.00 | 13 |
| 1998-11-02 | Fracture | 702.00 | 703.00 | 0 |
| 1998-11-04 | Packing Device Capped w/Cement | 691.00 | 699.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1996 | 240 | 0.0 | 0.0 | 0.0 |
| 1997 | 8619 | 0.0 | 0.0 | 0.0 |
| 1998 | 5356 | 0.0 | 0.0 | 0.0 |
| 2007 | 6228 | 0.0 | 0.0 | 0.0 |
| 2008 | 8707 | 0.0 | 0.0 | 0.0 |
| 2009 | 8643 | 0.0 | 0.0 | 0.0 |
| 2010 | 7727 | 0.0 | 0.0 | 0.0 |
| 2011 | 8735 | 0.0 | 0.0 | 0.0 |
| 2012 | 8755 | 0.0 | 0.0 | 0.0 |
| 2013 | 8732 | 0.0 | 0.0 | 0.0 |
| 2014 | 8715 | 0.0 | 0.0 | 0.0 |
| 2015 | 8693 | 0.0 | 0.0 | 0.0 |
| 2016 | 8144 | 0.0 | 0.0 | 0.0 |
| 2017 | 8730 | 0.0 | 0.0 | 0.0 |
| 2018 | 8740 | 0.0 | 0.0 | 0.0 |
| 2019 | 8447 | 0.0 | 0.0 | 0.0 |
| 2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[6]