If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0094161915020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 02/15-19-009-16W4/0 | |
Location Alias: 02/15-19-09-16 W4M | |
Location Alias 2: 02/15-19-009-16 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 4 | |
Range: 16 | |
Section: 19 | |
County/Municipality: Municipal District of Taber | |
Well Name: CNRL TABER 15-19-9-16 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0176600 | |
License Date: 1995-03-02 | |
License Status: Issued | |
Spud Date: 1995-03-17 | |
Final Drill Date: 1995-03-21 | |
Well Total Depth: 1097.00 m | |
Surface Hole Latitude: 49.756212 | |
Surface Hole Longitude: -112.160111 |
Date | Event |
---|---|
1995-03-02 | Obtained License |
1995-03-18 | Surface Casing Operation Performed |
1995-03-19 | Direction Drilling Operation Performed - Deviate |
1995-03-21 | Finished Drilling |
1995-03-21 | Well Log Performed |
1995-03-21 | Well Mode changed to Drilled and Cased |
1995-03-22 | Production Casing Operation Performed |
1995-03-23 | Rig Released |
1995-05-03 | Perforation Treatment Performed - Jet Perforation |
1995-05-03 | Well Log Performed |
1995-05-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-06-19 | Well Log Performed |
1995-07-23 | Well Began Injection |
1995-07-23 | Well Fluid changed to Water |
1995-07-23 | Well Type changed to Injection |
1995-09-11 | Perforation Treatment Performed - Fractured |
2002-06-21 | Well Log Performed |
2018-03-31 | Well Fluid changed to Water |
2018-03-31 | Well Mode changed to Suspended |
2018-03-31 | Well Type changed to Injection |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1995-03-19 | 235.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-05-03 | Perforation | 1048.50 | 1055.00 | 13 |
1995-05-03 | Perforation | 1057.00 | 1061.00 | 13 |
1995-05-04 | Acid Treatment | 1048.50 | 1061.00 | 0 |
1995-09-11 | Fracture | 1048.50 | 1061.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
2006 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]