X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094161816000

Well Details

Well ID: 0094161816000
Loading map...
Location: 00/16-18-009-16W4/0
Location Alias: 00/16-18-09-16 W4M
Location Alias 2: 00/16-18-009-16 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 16
Section: 18
County/Municipality: Municipal District of Taber
Well Name: CHEVRON TABER 16-18-9-16
Operator Name: Chevron Canada Limited
License Number: B0000525
License Date: 1943-10-28
License Status: Abandoned
Spud Date: 1943-11-04
Final Drill Date: 1943-11-26
Well Total Depth: 968.70 m
Surface Hole Latitude: 49.739525
Surface Hole Longitude: -112.151144

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1943-10-28 Obtained License
1943-11-22 Drill Stem Test Performed
1943-11-23 Drill Stem Test Performed
1943-11-26 Finished Drilling
1943-11-26 Well Mode changed to Drilled and Cased
1943-11-28 Perforation Treatment Performed - Open-Hole Completion
1943-11-28 Production Casing Operation Performed
1943-12-04 Drill Stem Test Performed
1943-12-22 Well Began Production
1943-12-22 Well Fluid changed to Crude Oil
1943-12-22 Well Mode changed to Pumping
1977-04-12 Well Fluid changed to Crude Oil
1977-04-12 Well Mode changed to Suspended
1979-11-16 Well Began Injection
1979-11-16 Well Fluid changed to Water
1979-11-16 Well Type changed to Injection
1984-03-05 Well Log Performed
1984-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-03-25 Perforation Treatment Performed - Cement Squeeze
1984-03-25 Perforation Treatment Performed - Jet Perforation
1984-03-26 Perforation Treatment Performed - Cement Squeeze
1984-03-26 Perforation Treatment Performed - Jet Perforation
1984-03-26 Well Abandoned
1984-03-26 Well Fluid changed to Water
1984-03-26 Well Mode changed to Abandoned
1984-03-26 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1943-11-28 Open Hole/Barefoot Completion 956.50 968.70 0
1984-03-24 Packing Device Capped w/Cement 930.00 938.00 0
1984-03-25 Perforation 300.00 300.90 13
1984-03-25 Cement Squeeze 300.00 300.90 0
1984-03-26 Perforation 200.00 200.90 13
1984-03-26 Cement Squeeze 200.00 200.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8594 0.0 0.0 0.0
1968 8078 0.0 0.0 0.0
1969 8234 0.0 0.0 0.0
1970 8309 0.0 0.0 0.0
1971 6260 0.0 0.0 0.0
1972 6439 0.0 0.0 0.0
1973 7099 0.0 0.0 0.0
1974 5405 0.0 0.0 0.0
1975 5608 0.0 0.0 0.0
1976 3205 0.0 0.0 0.0
1977 180 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0

For data sources see[5]

References