X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094161809030

Well Details

Well ID: 0094161809030
Loading map...
Location: 03/09-18-009-16W4/0
Location Alias: 03/09-18-09-16 W4M
Location Alias 2: 03/09-18-009-16 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 16
Section: 18
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 9-18-9-16
Operator Name: Canadian Natural Resources Limited
License Number: 0179038
License Date: 1995-07-05
License Status: Abandoned
Spud Date: 1995-07-24
Final Drill Date: 1995-07-28
Well Total Depth: 1020.00 m
Surface Hole Latitude: 49.737804
Surface Hole Longitude: -112.154808

For data sources see[1][2]

Well History

Date Event
1995-07-05 Obtained License
1995-07-25 Direction Drilling Operation Performed - Deviate
1995-07-25 Surface Casing Operation Performed
1995-07-28 Finished Drilling
1995-07-28 Well Log Performed
1995-07-28 Well Mode changed to Drilled and Cased
1995-07-29 Production Casing Operation Performed
1995-07-29 Rig Released
1995-08-01 Perforation Treatment Performed - Jet Perforation
1995-08-08 Well Began Production
1995-08-08 Well Fluid changed to Gas
1995-08-08 Well Mode changed to Flowing
1995-08-09 Well Fluid changed to Crude Oil
1995-08-09 Well Mode changed to Pumping
1995-08-25 Well Log Performed
2010-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-25 Plug Back Performed
2010-09-25 Well Fluid changed to Crude Oil
2010-09-25 Well Mode changed to Abandoned Zone
2011-02-02 Well Abandoned
2011-02-02 Well Fluid changed to Crude Oil
2011-02-02 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-07-25 310.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-08-01 Perforation 977.50 984.50 26
2010-09-25 Packing Device Capped w/Cement 954.50 966.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 3496 0.0 0.0 0.0
1996 8774 0.0 0.0 0.0
1997 8751 0.0 0.0 0.0
1998 8687 0.0 0.0 0.0
1999 8729 0.0 0.0 0.0
2000 8689 0.0 0.0 0.0
2001 8756 0.0 0.0 0.0
2002 7535 0.0 0.0 0.0
2007 5280 0.0 0.0 0.0
2008 8179 0.0 0.0 0.0
2009 3435 0.0 0.0 0.0

For data sources see[6]

References