If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0094161806052 |
![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() | ||||||||||||||||||||
Location: 05/06-18-009-16W4/2 | |||||||||||||||||||||
Location Alias: 05/06-18-09-16 W4M | |||||||||||||||||||||
Location Alias 2: 05/06-18-009-16 W4/02 | |||||||||||||||||||||
Country: Canada | |||||||||||||||||||||
Province: Alberta | |||||||||||||||||||||
Township: 009 | |||||||||||||||||||||
Meridian: 4 | |||||||||||||||||||||
Range: 16 | |||||||||||||||||||||
Section: 18 | |||||||||||||||||||||
County/Municipality: Municipal District of Taber | |||||||||||||||||||||
Well Name: CNRL TABER 6-18-9-16 | |||||||||||||||||||||
Operator Name: Canadian Natural Resources Limited | |||||||||||||||||||||
License Number: 0422734 | |||||||||||||||||||||
License Date: 2010-08-17 | |||||||||||||||||||||
License Status: Issued | |||||||||||||||||||||
Spud Date: 2010-10-14 | |||||||||||||||||||||
Final Drill Date: 2010-10-17 | |||||||||||||||||||||
Well Total Depth: 1069.00 m | |||||||||||||||||||||
Surface Hole Latitude: 49.734112 | |||||||||||||||||||||
Surface Hole Longitude: -112.160503 |
Date | Event |
---|---|
2010-08-17 | Obtained License |
2010-10-15 | Direction Drilling Operation Performed - Deviate |
2010-10-15 | Surface Casing Operation Performed |
2010-10-17 | Finished Drilling |
2010-10-17 | Well Log Performed |
2010-10-17 | Well Mode changed to Drilled and Cased |
2010-10-18 | Production Casing Operation Performed |
2010-10-19 | Rig Released |
2010-11-10 | Well Log Performed |
2010-11-14 | Perforation Treatment Performed - Jet Perforation |
2010-11-18 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-15 | 225.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-14 | Perforation | 1055.00 | 1056.00 | 20 |
2010-11-14 | Perforation | 1057.50 | 1058.50 | 20 |
2010-11-18 | Perforation | 1042.80 | 1044.50 | 20 |
2010-11-18 | Perforation | 1039.00 | 1040.50 | 20 |
For data sources see[5]