If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0094062816000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.770967,"lon":-110.751474,"icon":""}]} |
Location: 00/16-28-009-06W4/0 | |
Location Alias: 00/16-28-09-06 W4M | |
Location Alias 2: 00/16-28-009-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 4 | |
Range: 06 | |
Section: 28 | |
County/Municipality: Cypress County | |
Well Name: RTEC ET AL MEDHAT 16-28-9-6 | |
Operator Name: Gentra One Resources Inc. | |
License Number: 0091335 | |
License Date: 1981-07-20 | |
License Status: RecCertified | |
Spud Date: 1981-07-28 | |
Final Drill Date: 1981-07-30 | |
Well Total Depth: 495.00 m | |
Surface Hole Latitude: 49.770967 | |
Surface Hole Longitude: -110.751474 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-07-20 | Obtained License |
1981-07-29 | Production Casing Operation Performed |
1981-07-30 | Finished Drilling |
1981-07-30 | Perforation Treatment Performed - Open-Hole Completion |
1981-07-30 | Well Mode changed to Drilled and Cased |
1981-09-19 | Perforation Treatment Performed - Fractured |
1981-11-23 | Well Began Production |
1981-11-23 | Well Fluid changed to Gas |
1981-11-23 | Well Mode changed to Flowing |
1987-11-27 | Well Fluid changed to Gas |
1987-11-27 | Well Mode changed to Suspended |
1988-07-01 | Well Fluid changed to Gas |
1988-07-01 | Well Mode changed to Flowing |
1988-09-30 | Well Fluid changed to Gas |
1988-09-30 | Well Mode changed to Suspended |
1991-04-24 | Perforation Treatment Performed - Cement Plug |
1991-04-24 | Plug Back Performed |
1991-04-24 | Well Fluid changed to Gas |
1991-04-24 | Well Mode changed to Abandoned |
1991-05-21 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-07-30 | Open Hole/Barefoot Completion | 485.40 | 495.00 | 0 |
1981-09-19 | Fracture | 485.00 | 495.00 | 0 |
1991-04-24 | Cement Plug | 0.10 | 474.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 211 | 0.0 | 0.0 | 0.0 |
1982 | 3944 | 0.0 | 0.0 | 0.0 |
1983 | 3586 | 0.0 | 0.0 | 0.0 |
1984 | 7361 | 0.0 | 0.0 | 0.0 |
1985 | 8229 | 0.0 | 0.0 | 0.0 |
1986 | 7624 | 0.0 | 0.0 | 0.0 |
1987 | 7565 | 0.0 | 0.0 | 0.0 |
1988 | 1598 | 0.0 | 0.0 | 0.0 |
For data sources see[5]