If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0094052405004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.749346,"lon":-110.564218,"icon":""}]} |
Location: 00/05-24-009-05W4/4 | |
Location Alias: 00/05-24-09-05 W4M | |
Location Alias 2: 00/05-24-009-05 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 4 | |
Range: 05 | |
Section: 24 | |
County/Municipality: Cypress County | |
Well Name: PINE CLIFF ELKW 5-24-9-5 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0286299 | |
License Date: 2003-04-24 | |
License Status: Issued | |
Spud Date: 2003-07-17 | |
Final Drill Date: 2003-07-18 | |
Well Total Depth: 853.00 m | |
Surface Hole Latitude: 49.749346 | |
Surface Hole Longitude: -110.564218 |
Date | Event |
---|---|
2003-04-24 | Obtained License |
2003-07-11 | Surface Casing Operation Performed |
2003-07-18 | Finished Drilling |
2003-07-18 | Production Casing Operation Performed |
2003-07-18 | Rig Released |
2003-07-18 | Well Log Performed |
2003-07-18 | Well Mode changed to Drilled and Cased |
2003-07-28 | Perforation Treatment Performed - Jet Perforation |
2003-07-28 | Well Log Performed |
2003-07-30 | Perforation Treatment Performed - Jet Perforation |
2003-07-30 | Well Log Performed |
2003-08-05 | Perforation Treatment Performed - Cement Squeeze |
2003-08-15 | Perforation Treatment Performed - Jet Perforation |
2003-08-15 | Well Log Performed |
2003-08-17 | Perforation Treatment Performed - Jet Perforation |
2003-08-21 | Perforation Treatment Performed - Cement Squeeze |
2003-08-26 | Well Log Performed |
2003-09-01 | Perforation Treatment Performed - Fractured |
2004-04-23 | Well Began Production |
2004-04-23 | Well Fluid changed to Gas |
2004-04-23 | Well Mode changed to Flowing |
2004-12-12 | Perforation Treatment Performed - Jet Perforation |
2005-09-21 | Perforation Treatment Performed - Jet Perforation |
2005-10-15 | Perforation Treatment Performed - Fractured |
2006-03-01 | Well Fluid changed to Gas |
2006-03-01 | Well Mode changed to Suspended |
2008-02-09 | Well Fluid changed to Gas |
2008-02-09 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-07-28 | Perforation | 790.00 | 795.00 | 13 |
2005-09-21 | Perforation | 757.00 | 760.00 | 13 |
2005-09-21 | Perforation | 742.00 | 745.00 | 13 |
2005-09-21 | Perforation | 627.00 | 630.00 | 13 |
2005-09-21 | Perforation | 611.00 | 614.00 | 13 |
2005-09-21 | Perforation | 551.00 | 554.00 | 13 |
2005-09-21 | Perforation | 540.00 | 543.00 | 13 |
2005-09-21 | Perforation | 500.00 | 503.00 | 13 |
2005-10-15 | Fracture | 806.00 | 809.00 | 0 |
2005-10-15 | Fracture | 757.00 | 760.00 | 0 |
2005-10-15 | Fracture | 742.00 | 745.00 | 0 |
2003-07-30 | Perforation | 599.00 | 600.50 | 13 |
2005-10-15 | Fracture | 627.00 | 630.00 | 0 |
2005-10-15 | Fracture | 611.00 | 614.00 | 0 |
2005-10-15 | Fracture | 551.00 | 554.00 | 0 |
2005-10-15 | Fracture | 540.00 | 543.00 | 0 |
2005-10-15 | Fracture | 500.00 | 503.00 | 0 |
2003-08-05 | Cement Squeeze | 599.00 | 600.50 | 0 |
2003-08-15 | Perforation | 513.50 | 518.50 | 14 |
2003-08-17 | Perforation | 483.00 | 488.00 | 14 |
2003-08-21 | Cement Squeeze | 513.50 | 518.50 | 0 |
2003-09-01 | Fracture | 790.00 | 795.00 | 0 |
2004-12-12 | Perforation | 370.50 | 375.50 | 13 |
2005-09-21 | Perforation | 806.00 | 809.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 2401 | 0.0 | 0.0 | 0.0 |
2008 | 6302 | 0.0 | 0.0 | 0.0 |
2009 | 600 | 0.0 | 0.0 | 0.0 |
2010 | 6321 | 0.0 | 0.0 | 0.0 |
2011 | 8752 | 0.0 | 0.0 | 0.0 |
2012 | 2255 | 0.0 | 0.0 | 0.0 |
2013 | 3648 | 0.0 | 0.0 | 0.0 |
2014 | 8495 | 0.0 | 0.0 | 0.0 |
2015 | 7094 | 0.0 | 0.0 | 0.0 |
2016 | 8399 | 0.0 | 0.0 | 0.0 |
2017 | 8314 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 1777 | 0.0 | 0.0 | 0.0 |
For data sources see[5]