X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084232406022

Well Details

Well ID: 0084232406022
Loading map...
Location: 02/06-24-008-23W4/2
Location Alias: 02/06-24-08-23 W4M
Location Alias 2: 02/06-24-008-23 W4/02
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 23
Section: 24
County/Municipality: Blood 148
Well Name: TAC 102 HZ PENNY 6-24-8-23
Operator Name: Tamarack Acquisition Corp.
License Number: 0485309
License Date: 2017-09-07
License Status: Amended
Spud Date: 2017-09-12
Final Drill Date: 2017-10-16
Well Total Depth: 3439.00 m
Surface Hole Latitude: 49.673413
Surface Hole Longitude: -113.021482

For data sources see[1][2]

Well History

Date Event
2017-09-07 Obtained License
2017-09-12 Surface Casing Operation Performed
2017-09-15 Direction Drilling Operation Performed - Deviate
2017-09-16 Direction Drilling Operation Performed - Horizontal
2017-10-02 Intermediate Casing Operation Performed
2017-10-06 Direction Drilling Operation Performed - Horizontal
2017-10-16 Finished Drilling
2017-10-16 Well Log Performed
2017-10-16 Well Mode changed to Drilled and Cased
2017-10-19 Production Casing Operation Performed
2017-10-20 Rig Released
2017-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-07 Well Began Production
2017-12-07 Well Fluid changed to Crude Oil
2017-12-07 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-09-15 969.20 Deviate (5 - 79 degrees)
2017-09-16 1354.60 Horizontal
2017-10-06 1629.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-10-30 Multi-Stage Fracture 3382.20 3382.30 0
2017-10-31 Multi-Stage Fracture 3104.50 3104.60 0
2017-11-01 Multi-Stage Fracture 3051.50 3051.60 0
2017-11-01 Multi-Stage Fracture 3025.10 3025.20 0
2017-11-02 Multi-Stage Fracture 2998.50 2998.60 0
2017-11-02 Multi-Stage Fracture 2972.00 2972.10 0
2017-11-02 Multi-Stage Fracture 2945.50 2945.60 0
2017-11-02 Multi-Stage Fracture 2918.80 2918.90 0
2017-11-02 Multi-Stage Fracture 2865.50 2865.60 0
2017-11-02 Multi-Stage Fracture 2839.20 2839.30 0
2017-11-02 Multi-Stage Fracture 2812.60 2812.70 0
2017-10-30 Multi-Stage Fracture 3342.80 3342.90 0
2017-11-02 Multi-Stage Fracture 2786.20 2786.30 0
2017-11-02 Multi-Stage Fracture 2759.90 2760.00 0
2017-11-02 Multi-Stage Fracture 2733.30 2733.40 0
2017-11-05 Multi-Stage Fracture 2680.20 2680.30 0
2017-11-05 Multi-Stage Fracture 2653.80 2653.90 0
2017-11-05 Multi-Stage Fracture 2627.00 2627.10 0
2017-11-05 Multi-Stage Fracture 2600.40 2600.50 0
2017-11-05 Multi-Stage Fracture 2574.00 2574.10 0
2017-11-05 Multi-Stage Fracture 2547.50 2547.60 0
2017-11-06 Multi-Stage Fracture 2481.40 2481.50 0
2017-10-30 Multi-Stage Fracture 3316.20 3316.30 0
2017-11-07 Multi-Stage Fracture 2283.80 2283.90 0
2017-11-07 Multi-Stage Fracture 2231.00 2231.10 0
2017-11-07 Multi-Stage Fracture 2191.80 2191.90 0
2017-11-08 Multi-Stage Fracture 2152.10 2152.20 0
2017-11-08 Multi-Stage Fracture 2125.70 2125.80 0
2017-11-08 Multi-Stage Fracture 2099.20 2099.30 0
2017-11-08 Multi-Stage Fracture 2072.40 2072.50 0
2017-11-08 Multi-Stage Fracture 2045.80 2045.90 0
2017-11-08 Multi-Stage Fracture 2019.30 2019.40 0
2017-11-08 Multi-Stage Fracture 1992.70 1992.80 0
2017-10-30 Multi-Stage Fracture 3290.00 3290.10 0
2017-11-29 Multi-Stage Fracture 1939.60 1939.70 0
2017-11-29 Multi-Stage Fracture 1913.10 1913.20 0
2017-11-29 Multi-Stage Fracture 1886.40 1886.50 0
2017-11-29 Multi-Stage Fracture 1860.20 1860.30 0
2017-11-29 Multi-Stage Fracture 1833.60 1833.70 0
2017-11-29 Multi-Stage Fracture 1806.90 1807.00 0
2017-11-29 Multi-Stage Fracture 1780.40 1780.50 0
2017-11-29 Multi-Stage Fracture 1741.10 1741.20 0
2017-11-29 Multi-Stage Fracture 1701.60 1701.70 0
2017-11-30 Multi-Stage Fracture 1662.00 1662.10 0
2017-10-31 Multi-Stage Fracture 3237.00 3237.10 0
2017-11-30 Multi-Stage Fracture 1635.20 1635.30 0
2017-11-30 Multi-Stage Fracture 1608.60 1608.70 0
2017-11-30 Multi-Stage Fracture 1581.90 1582.00 0
2017-11-30 Multi-Stage Fracture 1555.10 1555.20 0
2017-11-30 Multi-Stage Fracture 1528.60 1528.70 0
2017-11-30 Multi-Stage Fracture 1501.80 1501.90 0
2017-11-30 Multi-Stage Fracture 1475.50 1475.60 0
2017-11-30 Multi-Stage Fracture 1449.30 1449.40 0
2017-10-31 Multi-Stage Fracture 3210.40 3210.50 0
2017-10-31 Multi-Stage Fracture 3184.00 3184.10 0
2017-10-31 Multi-Stage Fracture 3157.60 3157.70 0
2017-10-31 Multi-Stage Fracture 3131.10 3131.20 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-30 2017-11-30 1,241 3,998 N/A
2 2017-11-05 2017-11-05 1,241 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 90.6814 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 5.7063 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0615 N/A
water 7732-18-5 100 0.0615 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0532 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1337 N/A
Ethylene glycol 107-21-1 100 0.1337 N/A
Potassium Carbonate 584-08-7 100 0.1337 N/A
Potassium Hydroxide 1310-58-3 100 0.1337 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0033 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3121 N/A
IH-CN-1 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.1417 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.1418 N/A
water 7732-18-5 100 0.1417 N/A
2 Nitrogen Iron Horse Energy Services Energizing Fluid nitrogen 7727-37-9 100 0.1738 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-10-12 2017-10-31 Oilfield Produced Water 3995

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 594 0.0 0.0 0.0
2018 8184 0.0 0.0 0.0
2019 8481 0.0 0.0 0.0
2020 2161 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-20 No Incident Encountered 0.00 0.00
2017-12-05 No Incident Encountered 0.00 0.00

For data sources see[9]

References