X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084223016002

Well Details

Well ID: 0084223016002
Loading map...
Location: 00/16-30-008-22W4/2
Location Alias: 00/16-30-08-22 W4M
Location Alias 2: 00/16-30-008-22 W4/02
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 22
Section: 30
County/Municipality: Lethbridge County
Well Name: TAC PENNY 16-30-8-22
Operator Name: Tamarack Acquisition Corp.
License Number: 0082424
License Date: 1980-04-28
License Status: Issued
Spud Date: 1980-04-29
Final Drill Date: 1980-05-27
Well Total Depth: 1925.00 m
Surface Hole Latitude: 49.680832
Surface Hole Longitude: -112.964708

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-28 Obtained License
1980-05-12 Drill Stem Test Performed
1980-05-16 Drill Stem Test Performed
1980-05-27 Finished Drilling
1980-05-27 Well Mode changed to Drilled and Cased
1980-05-29 Drill Stem Test Performed
1980-05-30 Drill Stem Test Performed
1980-06-01 Production Casing Operation Performed
1980-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-13 Perforation Treatment Performed - Jet Perforation
1980-06-17 Perforation Treatment Performed - Jet Perforation
1980-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-25 Perforation Treatment Performed - Cement Squeeze
1980-06-25 Perforation Treatment Performed - Jet Perforation
1980-06-26 Perforation Treatment Performed - Cement Squeeze
1980-06-26 Perforation Treatment Performed - Jet Perforation
1980-07-04 Perforation Treatment Performed - Acid Wash - No Pressure
1980-07-09 Perforation Treatment Performed - Jet Perforation
1980-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-13 Perforation Treatment Performed - Cement Squeeze
1980-07-20 Perforation Treatment Performed - Cement Squeeze
1980-07-22 Perforation Treatment Performed - Jet Perforation
1980-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-10 Well Began Production
1980-08-10 Well Fluid changed to Crude Oil
1980-08-10 Well Mode changed to Flowing
1980-11-24 Perforation Treatment Performed - Cement Squeeze
1980-11-25 Perforation Treatment Performed - Cement Squeeze
1980-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-29 Well Fluid changed to Crude Oil
1980-11-29 Well Mode changed to Abandoned Zone
1980-11-30 Perforation Treatment Performed - Fractured
1984-04-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-04-08 Perforation Treatment Performed - Cement Plug
1984-04-09 Perforation Treatment Performed - Jet Perforation
1998-05-04 Perforation Treatment Performed - Jet Perforation
1998-05-04 Well Log Performed
1998-05-06 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-06-13 Perforation 1670.00 1685.00 7
1980-06-26 Cement Squeeze 1450.00 1453.00 0
1980-07-04 Acid Wash 1670.00 1685.00 0
1980-07-04 Acid Wash 1575.00 1625.00 0
1980-07-09 Perforation 1427.00 1445.40 7
1980-07-10 Acid Treatment 1427.00 1445.40 0
1980-07-13 Cement Squeeze 1427.00 1445.40 0
1980-07-20 Cement Squeeze 1427.00 1445.40 0
1980-07-22 Perforation 1427.00 1435.00 7
1980-07-23 Acid Treatment 1427.00 1435.00 0
1980-11-24 Cement Squeeze 1427.00 1435.00 0
1980-06-13 Acid Treatment 1670.00 1685.00 0
1980-11-25 Cement Squeeze 1427.00 1435.00 0
1980-11-29 Packing Device Capped w/Cement 1636.00 1642.00 0
1980-11-30 Fracture 1575.00 1625.00 0
1984-04-08 Cement Plug 1440.00 1494.00 0
1984-04-08 Packing Device Capped w/Cement 1417.00 1425.00 0
1984-04-09 Perforation 1150.00 1153.00 13
1998-05-04 Perforation 1028.00 1034.00 13
1998-05-06 Fracture 1028.00 1034.00 0
1980-06-17 Perforation 1575.00 1600.00 7
1980-06-17 Perforation 1600.00 1610.00 14
1980-06-17 Perforation 1610.00 1625.00 7
1980-06-18 Acid Treatment 1575.00 1625.00 0
1980-06-25 Perforation 1492.00 1495.00 14
1980-06-25 Cement Squeeze 1492.00 1495.00 0
1980-06-26 Perforation 1450.00 1453.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1459 0.0 0.0 0.0

For data sources see[5]

References