X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084201107000

Well Details

Well ID: 0084201107000
Loading map...
Location: 00/07-11-008-20W4/0
Location Alias: 00/07-11-08-20 W4M
Location Alias 2: 00/07-11-008-20 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 20
Section: 11
County/Municipality: Lethbridge County
Well Name: SOC COALDALE 7-11-8-20
Operator Name: AlphaBow Energy Ltd.
License Number: 0060566
License Date: 1976-10-08
License Status: Abandoned
Spud Date: 1976-10-12
Final Drill Date: 1976-10-20
Well Total Depth: 899.20 m
Surface Hole Latitude: 49.631677
Surface Hole Longitude: -112.611008

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-10-08 Obtained License
1976-10-19 Drill Stem Test Performed
1976-10-20 Finished Drilling
1976-10-20 Well Mode changed to Drilled and Cased
1976-10-21 Production Casing Operation Performed
1976-11-05 Perforation Treatment Performed - Jet Perforation
1976-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-09 Perforation Treatment Performed - Fractured
1977-01-03 Well Began Production
1977-01-03 Well Fluid changed to Gas
1977-01-03 Well Mode changed to Flowing
2003-03-08 Well Log Performed
2005-04-01 Well Fluid changed to Gas
2005-04-01 Well Mode changed to Suspended
2009-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-18 Plug Back Performed
2009-11-18 Well Fluid changed to Gas
2009-11-18 Well Log Performed
2009-11-18 Well Mode changed to Abandoned Zone
2009-12-17 Well Abandoned
2009-12-17 Well Fluid changed to Gas
2009-12-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-11-05 Perforation 825.40 826.30 3
1976-11-05 Perforation 837.00 838.50 3
1976-11-07 Acid Treatment 825.40 838.50 0
1976-11-09 Fracture 825.40 838.50 0
2009-11-18 Packing Device Capped w/Cement 787.00 795.00 0
2009-11-18 Packing Device Capped w/Cement 737.00 745.00 0
2009-11-18 Packing Device Capped w/Cement 787.00 795.00 0
2009-11-18 Packing Device Capped w/Cement 737.00 745.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 8469 0.0 0.0 0.0
1978 8164 0.0 0.0 0.0
1979 8541 0.0 0.0 0.0
1980 8705 0.0 0.0 0.0
1981 8370 0.0 0.0 0.0
1982 5498 0.0 0.0 0.0
1983 5018 0.0 0.0 0.0
1984 6124 0.0 0.0 0.0
1985 7252 0.0 0.0 0.0
1986 5872 0.0 0.0 0.0
1987 3845 0.0 0.0 0.0
1988 5675 0.0 0.0 0.0
1989 7710 0.0 0.0 0.0
1990 5769 0.0 0.0 0.0
1991 5134 0.0 0.0 0.0
1992 2362 0.0 0.0 0.0
1993 5485 0.0 0.0 0.0
1994 3600 0.0 0.0 0.0
1995 1121 0.0 0.0 0.0
1996 4416 0.0 0.0 0.0
1997 3004 0.0 0.0 0.0
1998 290 0.0 0.0 0.0

For data sources see[5]

References