X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084163203000

Well Details

Well ID: 0084163203000
Loading map...
Location: 00/03-32-008-16W4/0
Location Alias: 00/03-32-08-16 W4M
Location Alias 2: 00/03-32-008-16 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 16
Section: 32
County/Municipality: Municipal District of Taber
Well Name: CNRL HORSEFLY 3-32-8-16
Operator Name: Canadian Natural Resources Limited
License Number: 0029764
License Date: 1966-01-07
License Status: Suspension
Spud Date: 1966-01-21
Final Drill Date: 1966-01-26
Well Total Depth: 983.00 m
Surface Hole Latitude: 49.685815
Surface Hole Longitude: -112.141100

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-01-07 Obtained License
1966-01-26 Drill Stem Test Performed
1966-01-26 Finished Drilling
1966-01-26 Well Mode changed to Drilled and Cased
1966-01-27 Drill Stem Test Performed
1966-01-28 Production Casing Operation Performed
1966-02-05 Perforation Treatment Performed - Jet Perforation
1966-02-09 Perforation Treatment Performed - Jet Perforation
1966-02-10 Perforation Treatment Performed - Cement Squeeze
1966-02-12 Perforation Treatment Performed - Jet Perforation
1966-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-02-15 Perforation Treatment Performed - Acid Wash - No Pressure
1966-03-27 Perforation Treatment Performed - Abrasa-Jet Perforation
1966-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-28 Perforation Treatment Performed - Cement Squeeze
1966-03-29 Perforation Treatment Performed - Abrasa-Jet Perforation
1966-03-29 Perforation Treatment Performed - Acid Wash - No Pressure
1966-04-05 Perforation Treatment Performed - Jet Perforation
1966-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-04-23 Well Began Production
1966-04-23 Well Fluid changed to Crude Oil
1966-04-23 Well Mode changed to Pumping
1995-05-11 Perforation Treatment Performed - Cement Squeeze
1995-05-14 Perforation Treatment Performed - Jet Perforation
1995-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-05-16 Well Log Performed
1995-09-01 Well Began Injection
1995-09-01 Well Fluid changed to Water
1995-09-01 Well Type changed to Injection
2016-09-30 Well Fluid changed to Water
2016-09-30 Well Mode changed to Suspended
2016-09-30 Well Type changed to Injection
2016-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-11-19 Plug Back Performed
2016-11-19 Well Fluid changed to Water
2016-11-19 Well Mode changed to Abandoned Zone
2016-11-19 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-02-05 Perforation 958.90 960.10 13
1966-03-29 Hydra Jet Perforation 957.10 957.70 0
1966-03-29 Acid Wash 957.10 957.70 0
1966-04-05 Perforation 958.90 960.10 13
1966-04-13 Acid Treatment 957.10 960.10 0
1966-04-19 Acid Treatment 957.10 960.10 0
1995-05-11 Cement Squeeze 957.10 960.10 0
1995-05-14 Perforation 965.60 970.10 13
1995-05-15 Acid Treatment 965.60 970.10 0
2016-11-19 Packing Device Capped w/Cement 939.00 947.00 0
1966-02-09 Perforation 966.80 967.40 7
1966-02-10 Cement Squeeze 958.90 967.40 0
1966-02-12 Perforation 956.80 958.00 10
1966-02-15 Acid Wash 956.80 958.00 0
1966-02-15 Acid Treatment 956.80 958.00 0
1966-03-27 Hydra Jet Perforation 966.20 966.80 0
1966-03-27 Acid Treatment 966.20 966.80 0
1966-03-28 Cement Squeeze 966.20 966.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 1372 0.0 0.0 0.0
1968 4225 0.0 0.0 0.0
1969 8672 0.0 0.0 0.0
1970 8470 0.0 0.0 0.0
1971 8704 0.0 0.0 0.0
1972 8400 0.0 0.0 0.0
1973 8685 0.0 0.0 0.0
1974 6151 0.0 0.0 0.0
1975 7844 0.0 0.0 0.0
1976 6338 0.0 0.0 0.0
1977 7858 0.0 0.0 0.0
1978 8085 0.0 0.0 0.0
1979 8205 0.0 0.0 0.0
1980 8214 0.0 0.0 0.0
1981 7965 0.0 0.0 0.0
1982 5806 0.0 0.0 0.0
1983 7864 0.0 0.0 0.0
1984 8184 0.0 0.0 0.0
1985 8143 0.0 0.0 0.0
1986 8390 0.0 0.0 0.0
1987 8670 0.0 0.0 0.0
1988 8307 0.0 0.0 0.0
1989 8622 0.0 0.0 0.0
1990 8415 0.0 0.0 0.0
1991 8520 0.0 0.0 0.0
1992 8411 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 3983 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-11-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References