X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084162011000

Well Details

Well ID: 0084162011000
Loading map...
Location: 00/11-20-008-16W4/0
Location Alias: 00/11-20-08-16 W4M
Location Alias 2: 00/11-20-008-16 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 16
Section: 20
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 11-20-8-16
Operator Name: Canadian Natural Resources Limited
License Number: 0024653
License Date: 1963-08-09
License Status: Abandoned
Spud Date: 1963-08-10
Final Drill Date: 1963-08-14
Well Total Depth: 1003.40 m
Surface Hole Latitude: 49.663928
Surface Hole Longitude: -112.141108

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-08-09 Obtained License
1963-08-14 Drill Stem Test Performed
1963-08-14 Finished Drilling
1963-08-14 Well Mode changed to Drilled and Cased
1963-08-15 Production Casing Operation Performed
1963-08-29 Perforation Treatment Performed - Acid Wash - No Pressure
1963-08-29 Perforation Treatment Performed - Bullet Perforation
1963-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-06 Well Began Production
1963-09-06 Well Fluid changed to Crude Oil
1963-09-06 Well Mode changed to Pumping
1964-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-23 Perforation Treatment Performed - Jet Perforation
1964-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-22 Perforation Treatment Performed - Fractured
1980-07-08 Perforation Treatment Performed - Jet Perforation
1980-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-10 Perforation Treatment Performed - Jet Perforation
1980-07-16 Perforation Treatment Performed - Cement Squeeze
1980-07-21 Perforation Treatment Performed - Jet Perforation
1980-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-26 Well Began Injection
1980-11-26 Well Fluid changed to Water
1980-11-26 Well Type changed to Injection
1986-09-16 Perforation Treatment Performed - Fractured
1995-01-22 Well Log Performed
1995-05-10 Perforation Treatment Performed - Jet Perforation
1995-05-11 Perforation Treatment Performed - Cement Squeeze
1995-05-11 Plug Back Performed
1995-05-11 Well Fluid changed to Water
1995-05-11 Well Mode changed to Abandoned Zone
1995-05-11 Well Type changed to Injection
1995-05-13 Perforation Treatment Performed - Jet Perforation
2003-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-01 Plug Back Performed
2003-12-01 Well Log Performed
2010-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-19 Plug Back Performed
2010-10-19 Well Log Performed
2010-10-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-08-29 Bullet Perforation 972.90 974.10 0
1964-04-22 Fracture 970.80 974.10 0
1980-07-08 Perforation 975.50 978.50 13
1980-07-10 Perforation 975.20 978.20 13
1980-07-10 Acid Treatment 975.20 978.50 0
1980-07-16 Cement Squeeze 970.80 974.10 0
1980-07-21 Perforation 969.60 973.50 13
1980-07-22 Acid Treatment 969.60 973.50 0
1980-08-29 Acid Treatment 969.60 973.50 0
1986-09-16 Fracture 970.80 973.50 0
1995-05-10 Perforation 969.50 973.50 13
1963-08-29 Bullet Perforation 970.80 974.10 0
1995-05-11 Cement Squeeze 969.50 973.50 0
1995-05-13 Perforation 990.00 993.60 13
2003-12-01 Packing Device Capped w/Cement 977.00 985.00 0
2010-10-19 Packing Device Capped w/Cement 950.00 958.00 0
1963-08-29 Acid Wash 970.80 974.10 0
1963-08-31 Acid Treatment 970.80 974.10 0
1964-03-22 Acid Treatment 970.80 974.10 0
1964-03-23 Acid Treatment 970.80 974.10 0
1964-03-23 Perforation 970.80 972.00 10
1964-03-23 Perforation 972.90 974.10 10
1964-03-24 Acid Treatment 970.80 974.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1390 0.0 0.0 0.0
1968 4242 0.0 0.0 0.0
1969 8677 0.0 0.0 0.0
1970 8676 0.0 0.0 0.0
1971 8712 0.0 0.0 0.0
1972 8312 0.0 0.0 0.0
1973 7606 0.0 0.0 0.0
1974 8293 0.0 0.0 0.0
1975 6710 0.0 0.0 0.0
1976 5281 0.0 0.0 0.0
1977 6905 0.0 0.0 0.0
1978 8305 0.0 0.0 0.0
1979 7081 0.0 0.0 0.0
1980 4432 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0

For data sources see[5]

References