X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084160116002

Well Details

Well ID: 0084160116002
Loading map...
Location: 00/16-01-008-16W4/2
Location Alias: 00/16-01-08-16 W4M
Location Alias 2: 00/16-01-008-16 W4/02
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 16
Section: 01
County/Municipality: Municipal District of Taber
Well Name: ARROW POINT TABERSE 16-1-8-16
Operator Name: Taber Water Disposal Inc.
License Number: 0024847
License Date: 1963-09-20
License Status: Issued
Spud Date: 1963-09-20
Final Drill Date: 1963-09-25
Well Total Depth: 1007.40 m
Surface Hole Latitude: 49.623954
Surface Hole Longitude: -112.039626

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-09-20 Obtained License
1963-09-24 Drill Stem Test Performed
1963-09-25 Finished Drilling
1963-09-25 Well Mode changed to Drilled and Cased
1963-09-26 Production Casing Operation Performed
1963-11-13 Perforation Treatment Performed - Jet Perforation
1963-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-29 Perforation Treatment Performed - Cement Squeeze
1966-11-30 Perforation Treatment Performed - Jet Perforation
1966-12-01 Well Began Injection
1966-12-01 Well Fluid changed to Water
1966-12-01 Well Type changed to Disposal
1974-10-09 Perforation Treatment Performed - Jet Perforation
1974-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-01 Well Fluid changed to Water
2000-09-01 Well Mode changed to Suspended
2000-09-01 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-11-13 Perforation 985.70 988.20 10
1974-10-11 Acid Treatment 969.60 976.30 0
1963-11-13 Perforation 993.00 995.50 10
1963-11-14 Acid Treatment 985.70 995.50 0
1966-11-29 Cement Squeeze 985.70 995.50 0
1966-11-30 Perforation 973.50 974.80 13
1966-11-30 Perforation 978.40 979.60 13
1974-10-09 Perforation 969.60 970.80 13
1974-10-09 Perforation 971.40 972.60 13
1974-10-09 Perforation 975.70 976.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0

For data sources see[5]

References