If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0084151906000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.660318,"lon":-112.028213,"icon":""}]} |
Location: 00/06-19-008-15W4/0 | |
Location Alias: 00/06-19-08-15 W4M | |
Location Alias 2: 00/06-19-008-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 008 | |
Meridian: 4 | |
Range: 15 | |
Section: 19 | |
County/Municipality: Municipal District of Taber | |
Well Name: BRALSAMAN TABER NO. 1 | |
Operator Name: Maloney-Crawford Manufacturing Co. Ltd. | |
License Number: 0004992 | |
License Date: 1952-07-14 | |
License Status: RecExempt | |
Spud Date: 1952-07-19 | |
Final Drill Date: 1952-08-31 | |
Well Total Depth: 1006.10 m | |
Surface Hole Latitude: 49.660318 | |
Surface Hole Longitude: -112.028213 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-07-14 | Obtained License |
1952-07-26 | Drill Stem Test Performed |
1952-07-27 | Drill Stem Test Performed |
1952-08-05 | Drill Stem Test Performed |
1952-08-06 | Drill Stem Test Performed |
1952-08-26 | Drill Stem Test Performed |
1952-08-30 | Drill Stem Test Performed |
1952-08-31 | Finished Drilling |
1952-09-01 | Production Casing Operation Performed |
1952-09-04 | Well Mode changed to Drilled and Cased |
1952-09-17 | Perforation Treatment Performed - Jet Perforation |
1954-12-23 | Perforation Treatment Performed - Cement Squeeze |
1955-01-12 | Perforation Treatment Performed - Bullet Perforation |
1955-01-18 | Well Began Production |
1955-01-18 | Well Fluid changed to Crude Oil |
1955-01-18 | Well Mode changed to Pumping |
1958-07-30 | Well Abandoned |
1958-07-30 | Well Fluid changed to Crude Oil |
1958-07-30 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-09-17 | Perforation | 972.30 | 972.90 | 26 |
1954-12-23 | Cement Squeeze | 972.30 | 972.90 | 0 |
1955-01-12 | Bullet Perforation | 971.10 | 972.30 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]