If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0084150902000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.628528,"lon":-111.975553,"icon":""}]} |
Location: 00/02-09-008-15W4/0 | |
Location Alias: 00/02-09-08-15 W4M | |
Location Alias 2: 00/02-09-008-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 008 | |
Meridian: 4 | |
Range: 15 | |
Section: 09 | |
County/Municipality: Municipal District of Taber | |
Well Name: ARROW POINT TABERSE 2-9-8-15 | |
Operator Name: Taber Water Disposal Inc. | |
License Number: 0159464 | |
License Date: 1993-06-25 | |
License Status: Issued | |
Spud Date: 1993-11-15 | |
Final Drill Date: 1993-11-18 | |
Well Total Depth: 1006.00 m | |
Surface Hole Latitude: 49.628528 | |
Surface Hole Longitude: -111.975553 |
Date | Event |
---|---|
1993-06-25 | Obtained License |
1993-11-15 | Surface Casing Operation Performed |
1993-11-18 | Finished Drilling |
1993-11-18 | Well Log Performed |
1993-11-18 | Well Mode changed to Drilled and Cased |
1993-11-19 | Production Casing Operation Performed |
1993-11-19 | Rig Released |
1993-11-23 | Perforation Treatment Performed - Jet Perforation |
1993-11-25 | Perforation Treatment Performed - Fractured |
1993-12-08 | Well Began Production |
1993-12-08 | Well Fluid changed to Crude Oil |
1993-12-08 | Well Mode changed to Pumping |
1994-08-08 | Well Fluid changed to Crude Oil |
1994-08-08 | Well Mode changed to Suspended |
2002-12-21 | Well Fluid changed to Crude Oil |
2002-12-21 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-11-23 | Perforation | 962.00 | 963.00 | 13 |
1993-11-23 | Perforation | 964.00 | 966.00 | 13 |
1993-11-23 | Perforation | 967.00 | 971.00 | 13 |
1993-11-25 | Fracture | 962.00 | 971.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 547 | 0.0 | 0.0 | 0.0 |
1994 | 3489 | 0.0 | 0.0 | 0.0 |
2002 | 256 | 0.0 | 0.0 | 0.0 |
2003 | 8115 | 0.0 | 0.0 | 0.0 |
2004 | 8107 | 0.0 | 0.0 | 0.0 |
2005 | 7660 | 0.0 | 0.0 | 0.0 |
2006 | 8240 | 0.0 | 0.0 | 0.0 |
2007 | 8045 | 0.0 | 0.0 | 0.0 |
2008 | 7810 | 0.0 | 0.0 | 0.0 |
2009 | 1660 | 0.0 | 0.0 | 0.0 |
2010 | 7928 | 0.0 | 0.0 | 0.0 |
2011 | 5938 | 0.0 | 0.0 | 0.0 |
2012 | 7294 | 0.0 | 0.0 | 0.0 |
2013 | 8057 | 0.0 | 0.0 | 0.0 |
2014 | 2976 | 0.0 | 0.0 | 0.0 |
2015 | 7224 | 0.0 | 0.0 | 0.0 |
2016 | 6239 | 0.0 | 0.0 | 0.0 |
2017 | 4992 | 0.0 | 0.0 | 0.0 |
2019 | 30 | 0.0 | 0.0 | 0.0 |
For data sources see[5]