If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0084150208002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.617211,"lon":-111.925414,"icon":""}]} |
Location: 00/08-02-008-15W4/2 | |
Location Alias: 00/08-02-08-15 W4M | |
Location Alias 2: 00/08-02-008-15 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 008 | |
Meridian: 4 | |
Range: 15 | |
Section: 02 | |
County/Municipality: Municipal District of Taber | |
Well Name: CNRL CHINCO 8-2-8-15 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0092638 | |
License Date: 1981-10-07 | |
License Status: Suspension | |
Spud Date: 1981-10-07 | |
Final Drill Date: 1998-11-22 | |
Well Total Depth: 976.90 m | |
Surface Hole Latitude: 49.617211 | |
Surface Hole Longitude: -111.925414 |
Date | Event |
---|---|
1981-10-07 | Obtained License |
1981-10-19 | Perforation Treatment Performed - Jet Perforation |
1981-10-21 | Perforation Treatment Performed - Fractured |
1998-11-17 | Perforation Treatment Performed - Cement Squeeze |
1998-11-17 | Plug Back Performed |
1998-11-22 | Finished Drilling |
1998-11-22 | Perforation Treatment Performed - Open-Hole Completion |
1998-11-22 | Well Mode changed to Drilled and Cased |
1998-11-26 | Well Began Production |
1998-11-26 | Well Fluid changed to Crude Oil |
1998-11-26 | Well Mode changed to Pumping |
1998-11-27 | Well Fluid changed to Crude Oil |
1998-11-27 | Well Mode changed to Pumping |
2010-01-01 | Well Fluid changed to Crude Oil |
2010-01-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-10-19 | Perforation | 953.50 | 956.50 | 13 |
1981-10-21 | Fracture | 953.50 | 956.50 | 0 |
1998-11-17 | Cement Squeeze | 953.50 | 956.50 | 0 |
1998-11-22 | Open Hole/Barefoot Completion | 968.40 | 976.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 912 | 0.0 | 0.0 | 0.0 |
1999 | 8718 | 0.0 | 0.0 | 0.0 |
2000 | 8745 | 0.0 | 0.0 | 0.0 |
2001 | 8736 | 0.0 | 0.0 | 0.0 |
2002 | 8747 | 0.0 | 0.0 | 0.0 |
2003 | 7366 | 0.0 | 0.0 | 0.0 |
2004 | 5947 | 0.0 | 0.0 | 0.0 |
2005 | 7818 | 0.0 | 0.0 | 0.0 |
2006 | 8529 | 0.0 | 0.0 | 0.0 |
2007 | 8671 | 0.0 | 0.0 | 0.0 |
2008 | 8712 | 0.0 | 0.0 | 0.0 |
2009 | 648 | 0.0 | 0.0 | 0.0 |
For data sources see[5]