X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084150202000

Well Details

Well ID: 0084150202000
Loading map...
Location: 00/02-02-008-15W4/0
Location Alias: 00/02-02-08-15 W4M
Location Alias 2: 00/02-02-008-15 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 15
Section: 02
County/Municipality: Municipal District of Taber
Well Name: CNRL RE CHINCO 2-2-8-15
Operator Name: Canadian Natural Resources Limited
License Number: 0045431
License Date: 1973-03-15
License Status: Suspension
Spud Date: 1973-03-27
Final Drill Date: 2005-02-23
Well Total Depth: 976.40 m
Surface Hole Latitude: 49.612505
Surface Hole Longitude: -111.933336

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-03-15 Obtained License
1973-03-31 Drill Stem Test Performed
1973-03-31 Well Mode changed to Drilled and Cased
1973-04-01 Drill Stem Test Performed
1973-04-02 Production Casing Operation Performed
1973-04-11 Perforation Treatment Performed - Jet Perforation
1973-04-12 Perforation Treatment Performed - Jet Perforation
1973-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-04-20 Well Began Production
1973-04-20 Well Fluid changed to Crude Oil
1973-04-20 Well Mode changed to Pumping
1982-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-27 Perforation Treatment Performed - Jet Perforation
1998-10-31 Well Fluid changed to Crude Oil
1998-10-31 Well Mode changed to Suspended
2005-02-23 Finished Drilling
2005-02-23 Perforation Treatment Performed - Cement Squeeze
2005-02-23 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-04-11 Perforation 963.80 964.10 10
1973-04-12 Perforation 958.90 963.80 7
1973-04-13 Acid Treatment 958.90 964.10 0
1982-08-27 Perforation 965.60 966.60 0
1982-08-27 Acid Treatment 965.60 966.60 0
2005-02-23 Cement Squeeze 958.90 966.00 0
2005-02-23 Open Hole/Barefoot Completion 969.60 976.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 5970 0.0 0.0 0.0
1974 7492 0.0 0.0 0.0
1975 6113 0.0 0.0 0.0
1976 5968 0.0 0.0 0.0
1977 8263 0.0 0.0 0.0
1978 7728 0.0 0.0 0.0
1979 8707 0.0 0.0 0.0
1980 7163 0.0 0.0 0.0
1981 8717 0.0 0.0 0.0
1982 8364 0.0 0.0 0.0
1983 8613 0.0 0.0 0.0
1984 8753 0.0 0.0 0.0
1985 7688 0.0 0.0 0.0
1986 8287 0.0 0.0 0.0
1987 8555 0.0 0.0 0.0
1988 8231 0.0 0.0 0.0
1989 8543 0.0 0.0 0.0
1990 7583 0.0 0.0 0.0
1991 2392 0.0 0.0 0.0
1992 8777 0.0 0.0 0.0
1993 8754 0.0 0.0 0.0
1994 8145 0.0 0.0 0.0
1995 8244 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8543 0.0 0.0 0.0
1998 2494 0.0 0.0 0.0

For data sources see[5]

References