X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084150201000

Well Details

Well ID: 0084150201000
Loading map...
Location: 00/01-02-008-15W4/0
Location Alias: 00/01-02-08-15 W4M
Location Alias 2: 00/01-02-008-15 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 15
Section: 02
County/Municipality: Municipal District of Taber
Well Name: CNRL CHINCO 1-2-8-15
Operator Name: Canadian Natural Resources Limited
License Number: 0049969
License Date: 1974-06-03
License Status: Suspension
Spud Date: 1974-06-11
Final Drill Date: 1974-06-16
Well Total Depth: 979.90 m
Surface Hole Latitude: 49.612690
Surface Hole Longitude: -111.928906

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-06-03 Obtained License
1974-06-16 Finished Drilling
1974-06-16 Well Mode changed to Drilled and Cased
1974-06-18 Production Casing Operation Performed
1974-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-26 Perforation Treatment Performed - Jet Perforation
1974-07-04 Well Began Production
1974-07-04 Well Fluid changed to Crude Oil
1974-07-04 Well Mode changed to Pumping
1981-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-12 Plug Back Performed
1997-02-12 Well Fluid changed to Crude Oil
1997-02-12 Well Mode changed to Abandoned Zone
1999-05-26 Perforation Treatment Performed - Cement Squeeze
1999-05-26 Perforation Treatment Performed - Jet Perforation
1999-05-26 Plug Back Performed
1999-06-29 Perforation Treatment Performed - Open-Hole Completion
1999-07-07 Well Log Performed
2012-06-15 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-06-26 Perforation 956.20 957.70 7
1999-05-26 Cement Squeeze 956.20 965.60 0
1999-06-29 Open Hole/Barefoot Completion 969.90 979.90 0
1974-06-26 Perforation 960.10 961.90 7
1974-06-26 Perforation 963.20 965.60 7
1974-06-26 Acid Treatment 956.20 965.60 0
1981-06-02 Acid Treatment 956.20 965.60 0
1997-02-12 Packing Device Capped w/Cement 943.00 951.00 0
1999-05-26 Perforation 956.20 957.70 13
1999-05-26 Perforation 960.10 961.90 13
1999-05-26 Perforation 963.20 965.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 1297 0.0 0.0 0.0
1975 5641 0.0 0.0 0.0
1976 7274 0.0 0.0 0.0
1977 7996 0.0 0.0 0.0
1978 8543 0.0 0.0 0.0
1979 7892 0.0 0.0 0.0
1980 6984 0.0 0.0 0.0
1981 8321 0.0 0.0 0.0
1982 4985 0.0 0.0 0.0
1983 8373 0.0 0.0 0.0
1984 8302 0.0 0.0 0.0
1985 8267 0.0 0.0 0.0
1986 8409 0.0 0.0 0.0
1987 8556 0.0 0.0 0.0
1988 7936 0.0 0.0 0.0
1989 8614 0.0 0.0 0.0
1990 7223 0.0 0.0 0.0
1991 8503 0.0 0.0 0.0
1992 8687 0.0 0.0 0.0
1993 8705 0.0 0.0 0.0
1994 8687 0.0 0.0 0.0
1995 8471 0.0 0.0 0.0
1996 3768 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References