X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084141612000

Well Details

Well ID: 0084141612000
Loading map...
Location: 00/12-16-008-14W4/0
Location Alias: 00/12-16-08-14 W4M
Location Alias 2: 00/12-16-008-14 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 14
Section: 16
County/Municipality: Municipal District of Taber
Well Name: PCP CHIN COULEE 12-16-8-14
Operator Name: Ovintiv Canada ULC
License Number: 0178156
License Date: 1995-05-29
License Status: RecCertified
Spud Date: 1995-07-22
Final Drill Date: 1995-07-27
Well Total Depth: 1125.00 m
Surface Hole Latitude: 49.646241
Surface Hole Longitude: -111.855249

For data sources see[1][2]

Well History

Date Event
1995-05-29 Obtained License
1995-07-23 Surface Casing Operation Performed
1995-07-24 Direction Drilling Operation Performed - Deviate
1995-07-27 Finished Drilling
1995-07-27 Well Log Performed
1995-07-29 Production Casing Operation Performed
1995-07-29 Rig Released
1995-07-29 Well Mode changed to Drilled and Cased
1995-08-02 Well Log Performed
1995-12-14 Well Log Performed
1995-12-15 Well Log Performed
1995-12-16 Perforation Treatment Performed - Jet Perforation
1995-12-17 Well Log Performed
1995-12-18 Perforation Treatment Performed - Jet Perforation
1995-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-19 Well Log Performed
1995-12-20 Perforation Treatment Performed - Cement Squeeze
1995-12-20 Plug Back Performed
1995-12-29 Well Log Performed
1995-12-30 Perforation Treatment Performed - Jet Perforation
1999-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-01 Plug Back Performed
1999-06-01 Well Mode changed to Abandoned Zone
1999-06-07 Well Abandoned
1999-06-07 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-07-24 194.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-12-16 Perforation 1087.50 1088.50 20
1995-12-18 Perforation 1094.00 1094.30 20
1995-12-19 Acid Treatment 1087.50 1094.30 0
1995-12-20 Cement Squeeze 1087.50 1088.50 0
1995-12-30 Perforation 1087.50 1088.50 17
1999-06-01 Packing Device Capped w/Cement 1070.00 1078.00 0

For data sources see[5]



References