X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0075021804002

Well Details

Well ID: 0075021804002
Loading map...
Location: 00/04-18-007-02W5/2
Location Alias: 00/04-18-07-02 W5M
Location Alias 2: 00/04-18-007-02 W5/02
Country: Canada
Province: Alberta
Township: 007
Meridian: 5
Range: 02
Section: 18
County/Municipality: Municipal District of Pincher Creek No. 9
Well Name: SHELL BURMIS 8-18-7-2
Operator Name: Shell Canada Limited
License Number: 0186449
License Date: 1996-03-01
License Status: Abandoned
Spud Date: 1996-03-22
Final Drill Date: 1996-09-16
Well Total Depth: 4685.00 m
Surface Hole Latitude: 49.552187
Surface Hole Longitude: -114.255239

For data sources see[1][2]

Well History

Date Event
1996-03-01 Obtained License
1996-03-30 Surface Casing Operation Performed
1996-04-04 Direction Drilling Operation Performed - Deviate
1996-05-18 Direction Drilling Operation Performed - Sidetrack Fish
1996-07-04 Direction Drilling Operation Performed - Sidetrack Fish
1996-07-30 Intermediate Casing Operation Performed
1996-08-20 Well Log Performed
1996-08-23 Liner Casing Operation Performed
1996-08-27 Well Log Performed
1996-09-05 Kick Occurred
1996-09-16 Finished Drilling
1996-09-16 Well Mode changed to Drilled and Cased
1996-09-19 Well Log Performed
1996-09-21 Well Log Performed
1996-09-22 Liner Casing Operation Performed
1996-09-23 Well Log Performed
1996-09-24 Rig Released
1996-09-25 Well Log Performed
1997-01-08 Perforation Treatment Performed - Jet Perforation
1997-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-17 Perforation Treatment Performed - Jet Perforation
1997-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-12-14 Well Began Production
1998-12-14 Well Fluid changed to Gas
1998-12-14 Well Mode changed to Flowing
1999-04-06 Well Fluid changed to Gas
1999-04-06 Well Mode changed to Flowing
1999-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-12-21 Perforation Treatment Performed - Chemical Squeeze
1999-12-28 Perforation Treatment Performed - Chemical Squeeze
1999-12-31 Perforation Treatment Performed - Jet Perforation
2000-01-03 Perforation Treatment Performed - Acid Wash - No Pressure
2002-10-30 Perforation Treatment Performed - Cement Squeeze
2002-10-30 Plug Back Performed
2002-10-30 Well Fluid changed to Gas
2002-10-30 Well Mode changed to Abandoned Zone
2002-12-06 Well Log Performed
2002-12-10 Liner Casing Operation Performed
2003-01-05 Perforation Treatment Performed - Cement Squeeze
2003-02-05 Well Log Performed
2011-08-10 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-04-04 526.00 Deviate (5 - 79 degrees)
1996-05-18 936.00 Sidetrack fish
1996-07-04 3277.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-01-08 Perforation 3759.00 3763.00 13
1997-02-17 Perforation 3688.00 3691.00 7
1997-02-17 Acid Treatment 3678.00 3794.00 0
1997-02-19 Acid Treatment 3678.00 3794.00 0
1997-02-20 Acid Treatment 3678.00 3794.00 0
1997-02-21 Acid Treatment 3678.00 3794.00 0
1997-03-01 Acid Treatment 3678.00 3794.00 0
1999-12-17 Acid Treatment 3678.50 3794.00 0
1999-12-21 Chemical Squeeze 3678.50 3794.00 0
1999-12-28 Chemical Squeeze 3678.50 3794.00 0
1999-12-31 Perforation 3831.00 3835.00 20
1997-01-08 Perforation 3766.00 3767.00 13
1999-12-31 Perforation 3865.00 3868.00 20
1999-12-31 Perforation 3890.00 3892.00 20
2000-01-03 Acid Wash 3831.00 3892.00 0
2002-10-30 Cement Squeeze 3678.00 3892.00 0
2003-01-05 Cement Squeeze 3678.00 3892.00 0
1997-01-08 Perforation 3769.00 3770.50 13
1997-01-08 Perforation 3774.00 3777.00 13
1997-01-08 Perforation 3780.00 3786.00 13
1997-01-08 Perforation 3790.00 3794.00 13
1997-01-10 Acid Treatment 3759.00 3794.00 0
1997-01-11 Acid Treatment 3759.00 3794.00 0
1997-02-17 Perforation 3678.00 3682.00 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 362 0.0 0.0 0.0
1999 1506 0.0 0.0 0.0
2000 182 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-09-05 Kick 4305.00 4329.00

For data sources see[7]

References