If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0074200405002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/05-04-007-20W4/2 | |
| Location Alias: 00/05-04-07-20 W4M | |
| Location Alias 2: 00/05-04-007-20 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 007 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 04 | |
| County/Municipality: County of Warner No. 5 | |
| Well Name: SOC COALDALE 5-4-7-20 | |
| Operator Name: AlphaBow Energy Ltd. | |
| License Number: 0232424 | |
| License Date: 2000-01-21 | |
| License Status: Issued | |
| Spud Date: 2000-02-01 | |
| Final Drill Date: 2000-02-02 | |
| Well Total Depth: 996.00 m | |
| Surface Hole Latitude: 49.529616 | |
| Surface Hole Longitude: -112.662358 |
| Date | Event |
|---|---|
| 2000-01-21 | Obtained License |
| 2000-02-01 | Surface Casing Operation Performed |
| 2000-02-02 | Finished Drilling |
| 2000-02-02 | Production Casing Operation Performed |
| 2000-02-02 | Well Log Performed |
| 2000-02-02 | Well Mode changed to Drilled and Cased |
| 2000-02-03 | Rig Released |
| 2000-02-03 | Well Log Performed |
| 2000-02-17 | Well Log Performed |
| 2000-02-19 | Perforation Treatment Performed - Jet Perforation |
| 2000-02-19 | Well Log Performed |
| 2000-02-25 | Perforation Treatment Performed - Fractured |
| 2000-04-28 | Well Log Performed |
| 2000-04-29 | Perforation Treatment Performed - Jet Perforation |
| 2000-04-29 | Well Mode changed to Drilled and Cased |
| 2000-05-05 | Perforation Treatment Performed - Fractured |
| 2000-11-10 | Well Began Production |
| 2000-11-10 | Well Fluid changed to Gas |
| 2000-11-10 | Well Mode changed to Flowing |
| 2002-02-05 | Well Structure changed to Commingled |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2000-02-19 | Perforation | 920.00 | 921.00 | 20 |
| 2000-02-25 | Fracture | 920.00 | 921.00 | 0 |
| 2000-04-29 | Perforation | 820.50 | 822.50 | 13 |
| 2000-05-05 | Fracture | 820.50 | 822.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2000 | 783 | 0.0 | 0.0 | 0.0 |
| 2001 | 3936 | 0.0 | 0.0 | 0.0 |
| 2002 | 301 | 0.0 | 0.0 | 0.0 |
For data sources see[5]