If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0074171302002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.556181,"lon":-112.182739,"icon":""}]} |
Location: 00/02-13-007-17W4/2 | |
Location Alias: 00/02-13-07-17 W4M | |
Location Alias 2: 00/02-13-007-17 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 007 | |
Meridian: 4 | |
Range: 17 | |
Section: 13 | |
County/Municipality: County of Warner No. 5 | |
Well Name: CNRL TABERS 2-13-7-17 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0079282 | |
License Date: 1979-11-16 | |
License Status: Suspension | |
Spud Date: 1979-11-21 | |
Final Drill Date: 1992-11-21 | |
Well Total Depth: 1183.00 m | |
Surface Hole Latitude: 49.556181 | |
Surface Hole Longitude: -112.182739 |
Date | Event |
---|---|
1979-11-16 | Obtained License |
1979-11-27 | Production Casing Operation Performed |
1992-11-13 | Direction Drilling Operation Performed - Horizontal |
1992-11-21 | Finished Drilling |
1992-11-21 | Well Mode changed to Drilled and Cased |
1992-11-23 | Perforation Treatment Performed - Open-Hole Completion |
1992-11-23 | Rig Released |
1992-11-29 | Well Began Production |
1992-11-29 | Well Fluid changed to Crude Oil |
1992-11-29 | Well Mode changed to Pumping |
1993-01-20 | Well Log Performed |
1993-02-26 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1999-10-25 | Well Fluid changed to Crude Oil |
1999-10-25 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1992-11-13 | 934.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-11-23 | Open Hole/Barefoot Completion | 934.00 | 1183.00 | 0 |
1993-02-26 | Hydra Jet Perforation | 1075.60 | 1182.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 531 | 0.0 | 0.0 | 0.0 |
1993 | 8476 | 0.0 | 0.0 | 0.0 |
1994 | 8684 | 0.0 | 0.0 | 0.0 |
1995 | 6581 | 0.0 | 0.0 | 0.0 |
1996 | 8619 | 0.0 | 0.0 | 0.0 |
1997 | 7604 | 0.0 | 0.0 | 0.0 |
1998 | 4931 | 0.0 | 0.0 | 0.0 |
For data sources see[6]