X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0074163009030

Well Details

Well ID: 0074163009030
Loading map...
Location: 03/09-30-007-16W4/0
Location Alias: 03/09-30-07-16 W4M
Location Alias 2: 03/09-30-007-16 W4/00
Country: Canada
Province: Alberta
Township: 007
Meridian: 4
Range: 16
Section: 30
County/Municipality: County of Warner No. 5
Well Name: CNRL TABERS 9-30-7-16
Operator Name: Canadian Natural Resources Limited
License Number: 0187122
License Date: 1996-04-04
License Status: Abandoned
Spud Date: 1996-07-27
Final Drill Date: 1996-07-31
Well Total Depth: 1058.00 m
Surface Hole Latitude: 49.589914
Surface Hole Longitude: -112.150529

For data sources see[1][2]

Well History

Date Event
1996-04-04 Obtained License
1996-07-28 Direction Drilling Operation Performed - Deviate
1996-07-28 Surface Casing Operation Performed
1996-07-31 Finished Drilling
1996-07-31 Well Log Performed
1996-07-31 Well Mode changed to Drilled and Cased
1996-08-01 Production Casing Operation Performed
1996-08-01 Rig Released
1996-08-11 Perforation Treatment Performed - Jet Perforation
1996-08-12 Perforation Treatment Performed - Fractured
1996-08-12 Well Log Performed
1996-08-16 Well Began Production
1996-08-16 Well Fluid changed to Crude Oil
1996-08-16 Well Mode changed to Pumping
1996-11-30 Well Fluid changed to Crude Oil
1996-11-30 Well Mode changed to Suspended
1997-05-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-05-07 Plug Back Performed
1997-06-03 Well Abandoned
1997-06-03 Well Fluid changed to Crude Oil
1997-06-03 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-07-28 415.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-11 Perforation 989.50 991.00 13
1996-08-11 Perforation 993.50 994.50 13
1996-08-11 Perforation 996.50 998.50 13
1996-08-11 Perforation 1000.00 1002.00 13
1996-08-12 Fracture 989.50 1002.00 0
1997-05-07 Packing Device Capped w/Cement 977.00 985.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2208 0.0 0.0 0.0

For data sources see[6]

References