X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0074161607000

Well Details

Well ID: 0074161607000
Loading map...
Location: 00/07-16-007-16W4/0
Location Alias: 00/07-16-07-16 W4M
Location Alias 2: 00/07-16-007-16 W4/00
Country: Canada
Province: Alberta
Township: 007
Meridian: 4
Range: 16
Section: 16
County/Municipality: County of Warner No. 5
Well Name: CNRL TABERS 7-16-7-16
Operator Name: Canadian Natural Resources Limited
License Number: 0027732
License Date: 1965-02-10
License Status: Abandoned
Spud Date: 1965-03-17
Final Drill Date: 1965-03-21
Well Total Depth: 1034.20 m
Surface Hole Latitude: 49.558484
Surface Hole Longitude: -112.112917

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-02-10 Obtained License
1965-03-21 Finished Drilling
1965-03-21 Well Mode changed to Drilled and Cased
1965-03-22 Production Casing Operation Performed
1965-05-10 Perforation Treatment Performed - Jet Perforation
1965-05-16 Well Began Production
1965-05-16 Well Fluid changed to Crude Oil
1965-05-16 Well Mode changed to Pumping
1968-08-23 Perforation Treatment Performed - Fractured
1974-08-01 Well Fluid changed to Crude Oil
1974-08-01 Well Mode changed to Suspended
1975-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-04-19 Perforation Treatment Performed - Jet Perforation
1998-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-24 Perforation Treatment Performed - Cement Squeeze
1998-11-24 Plug Back Performed
1998-12-17 Well Abandoned
1998-12-17 Well Fluid changed to Crude Oil
1998-12-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-05-10 Perforation 982.70 988.20 7
1968-08-23 Fracture 982.70 988.20 0
1975-08-14 Packing Device Capped w/Cement 959.80 969.30 0
1993-04-19 Perforation 982.70 988.20 7
1998-11-24 Cement Squeeze 982.70 988.20 0
1998-11-24 Packing Device Capped w/Cement 616.00 624.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7843 0.0 0.0 0.0
1968 7646 0.0 0.0 0.0
1969 8494 0.0 0.0 0.0
1970 8552 0.0 0.0 0.0
1971 8167 0.0 0.0 0.0
1972 4737 0.0 0.0 0.0
1973 168 0.0 0.0 0.0
1974 176 0.0 0.0 0.0

For data sources see[5]

References