X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0074142902030

Well Details

Well ID: 0074142902030
Loading map...
Location: 03/02-29-007-14W4/0
Location Alias: 03/02-29-07-14 W4M
Location Alias 2: 03/02-29-007-14 W4/00
Country: Canada
Province: Alberta
Township: 007
Meridian: 4
Range: 14
Section: 29
County/Municipality: Municipal District of Taber
Well Name: CNRL HZ 103 CHINCO 2-29-7-14
Operator Name: Canadian Natural Resources Limited
License Number: 0443759
License Date: 2012-02-03
License Status: Issued
Spud Date: 2012-02-16
Final Drill Date: 2012-02-24
Well Total Depth: 1946.00 m
Surface Hole Latitude: 49.591774
Surface Hole Longitude: -111.873110

For data sources see[1][2]

Well History

Date Event
2012-02-03 Obtained License
2012-02-17 Well Log Performed
2012-02-19 Surface Casing Operation Performed
2012-02-20 Direction Drilling Operation Performed - Horizontal
2012-02-24 Finished Drilling
2012-02-24 Well Mode changed to Drilled and Cased
2012-02-26 Production Casing Operation Performed
2012-02-26 Rig Released
2012-02-28 Well Log Performed
2012-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-17 Well Log Performed
2012-03-20 Well Began Production
2012-03-20 Well Fluid changed to Crude Oil
2012-03-20 Well Mode changed to Pumping
2019-02-28 Well Fluid changed to Crude Oil
2019-02-28 Well Mode changed to Suspended
2019-04-01 Well Fluid changed to Crude Oil
2019-04-01 Well Mode changed to Pumping
2019-04-30 Well Fluid changed to Crude Oil
2019-04-30 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-16 Quintera Drilling Ltd. 2 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-20 702.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-09 Multi-Stage Fracture 1916.60 1916.70 0
2012-03-09 Multi-Stage Fracture 1200.60 1200.70 0
2012-03-09 Multi-Stage Fracture 1844.30 1844.40 0
2012-03-09 Multi-Stage Fracture 1728.90 1729.00 0
2012-03-09 Multi-Stage Fracture 1655.40 1655.50 0
2012-03-09 Multi-Stage Fracture 1582.70 1582.80 0
2012-03-09 Multi-Stage Fracture 1494.50 1494.60 0
2012-03-09 Multi-Stage Fracture 1435.30 1435.40 0
2012-03-09 Multi-Stage Fracture 1375.30 1375.40 0
2012-03-09 Multi-Stage Fracture 1301.10 1301.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6616 0.0 0.0 0.0
2013 8542 0.0 0.0 0.0
2014 7813 0.0 0.0 0.0
2015 8691 0.0 0.0 0.0
2016 8221 0.0 0.0 0.0
2017 7680 0.0 0.0 0.0
2018 8612 0.0 0.0 0.0
2019 360 0.0 0.0 0.0

For data sources see[7]

References