X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0064262206002

Well Details

Well ID: 0064262206002
Loading map...
Location: 00/06-22-006-26W4/2
Location Alias: 00/06-22-06-26 W4M
Location Alias 2: 00/06-22-006-26 W4/02
Country: Canada
Province: Alberta
Township: 006
Meridian: 4
Range: 26
Section: 22
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: CZAR ET AL STANDOFF 6-22-6-26
Operator Name: Canadian Natural Resources Limited
License Number: 0082819
License Date: 1980-05-15
License Status: RecCertified
Spud Date: 1980-05-18
Final Drill Date: 1980-07-06
Well Total Depth: 2720.00 m
Surface Hole Latitude: 49.486736
Surface Hole Longitude: -113.425538

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-15 Obtained License
1980-05-18 Lost Circulation Occurred
1980-05-20 Lost Circulation Occurred
1980-06-21 Drill Stem Test Performed
1980-06-22 Drill Stem Test Performed
1980-06-24 Lost Circulation Occurred
1980-06-26 Lost Circulation Occurred
1980-07-06 Finished Drilling
1980-07-07 Well Log Performed
1980-07-08 Drill Stem Test Performed
1980-07-13 Drill Stem Test Performed
1980-07-14 Drill Stem Test Performed
1980-07-17 Production Casing Operation Performed
1980-09-02 Perforation Treatment Performed - Jet Perforation
1980-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-05 Perforation Treatment Performed - Cement Squeeze
1980-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-08 Perforation Treatment Performed - Jet Perforation
1980-09-11 Perforation Treatment Performed - Cement Squeeze
1980-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-20 Perforation Treatment Performed - Jet Perforation
1980-09-21 Perforation Treatment Performed - Fractured
1980-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-25 Plug Back Performed
1980-09-26 Perforation Treatment Performed - Jet Perforation
1980-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-28 Perforation Treatment Performed - Fractured
1985-10-01 Well Mode changed to Drilled and Cased
1987-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-07-06 Plug Back Performed
1987-07-06 Well Mode changed to Abandoned
1987-07-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-02 Perforation 2623.00 2636.00 7
1980-09-20 Perforation 2478.50 2483.00 7
1980-09-21 Fracture 2478.50 2483.00 0
1980-09-25 Packing Device Capped w/Cement 2437.00 2445.00 0
1980-09-26 Perforation 2028.00 2052.00 7
1980-09-27 Acid Treatment 2028.00 2052.00 0
1980-09-28 Fracture 2028.00 2052.00 0
1987-07-06 Packing Device Capped w/Cement 1967.00 1975.00 0
1980-09-03 Acid Treatment 2623.00 2636.00 0
1980-09-05 Cement Squeeze 2623.00 2636.00 0
1980-09-08 Perforation 2602.00 2615.00 7
1980-09-08 Acid Treatment 2602.00 2615.00 0
1980-09-11 Cement Squeeze 2602.00 2615.00 0
1980-09-13 Acid Treatment 2602.00 2615.00 0
1980-09-14 Acid Treatment 2602.00 2615.00 0
1980-09-16 Packing Device Capped w/Cement 2574.00 2582.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-05-18 Lost Circulation 24.00 24.00
1980-05-20 Lost Circulation 146.00 146.00
1980-06-24 Lost Circulation 2203.00 2210.00
1980-06-26 Lost Circulation 2305.00 2323.00

For data sources see[5]

References