X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0064210314003

Well Details

Well ID: 0064210314003
Loading map...
Location: 00/14-03-006-21W4/3
Location Alias: 00/14-03-06-21 W4M
Location Alias 2: 00/14-03-006-21 W4/03
Country: Canada
Province: Alberta
Township: 006
Meridian: 4
Range: 21
Section: 03
County/Municipality: Cardston County
Well Name: TAC BLOOD 14-3-6-21
Operator Name: Tamarack Acquisition Corp.
License Number: 0272020
License Date: 2002-07-22
License Status: RecCertified
Spud Date: 2002-10-24
Final Drill Date: 2002-10-29
Well Total Depth: 1107.00 m
Surface Hole Latitude: 49.449114
Surface Hole Longitude: -112.751931

For data sources see[1][2]

Well History

Date Event
2002-07-22 Obtained License
2002-10-25 Surface Casing Operation Performed
2002-10-26 Direction Drilling Operation Performed - Deviate
2002-10-29 Finished Drilling
2002-10-29 Well Log Performed
2002-10-29 Well Mode changed to Drilled and Cased
2002-10-30 Production Casing Operation Performed
2002-10-30 Rig Released
2002-11-02 Perforation Treatment Performed - Jet Perforation
2002-11-02 Well Log Performed
2002-11-03 Perforation Treatment Performed - Jet Perforation
2002-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-07 Perforation Treatment Performed - Jet Perforation
2002-11-07 Plug Back Performed
2002-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-11 Plug Back Performed
2002-12-05 Well Began Production
2002-12-05 Well Fluid changed to Gas
2002-12-05 Well Mode changed to Flowing
2012-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-12-14 Plug Back Performed
2012-12-14 Well Abandoned
2012-12-14 Well Fluid changed to Gas
2012-12-14 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-10-26 435.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-11-02 Perforation 975.50 979.50 17
2002-11-03 Perforation 961.50 963.00 17
2002-11-07 Packing Device Capped w/Cement 966.00 974.00 0
2002-11-07 Perforation 916.00 917.50 17
2002-11-11 Packing Device Capped w/Cement 952.00 960.00 0
2012-12-14 Packing Device Capped w/Cement 895.00 905.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 624 0.0 0.0 0.0
2003 5227 0.0 0.0 0.0
2004 1414 0.0 0.0 0.0
2010 1487 0.0 0.0 0.0
2011 24 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-14 No Incident Encountered 0.00 0.00

For data sources see[7]

References