X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0064161912000

Well Details

Well ID: 0064161912000
Loading map...
Location: 00/12-19-006-16W4/0
Location Alias: 00/12-19-06-16 W4M
Location Alias 2: 00/12-19-006-16 W4/00
Country: Canada
Province: Alberta
Township: 006
Meridian: 4
Range: 16
Section: 19
County/Municipality: County of Warner No. 5
Well Name: CNRL WREN 12-19-6-16
Operator Name: Canadian Natural Resources Limited
License Number: 0071530
License Date: 1978-08-22
License Status: Amended
Spud Date: 1978-10-16
Final Drill Date: 1978-10-27
Well Total Depth: 1006.00 m
Surface Hole Latitude: 49.489868
Surface Hole Longitude: -112.157502

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-08-22 Obtained License
1978-10-27 Finished Drilling
1978-10-29 Production Casing Operation Performed
1978-11-15 Perforation Treatment Performed - Jet Perforation
1979-01-29 Well Mode changed to Drilled and Cased
1979-05-23 Well Began Production
1979-05-23 Well Fluid changed to Crude Oil
1979-05-23 Well Mode changed to Flowing
1982-06-16 Perforation Treatment Performed - Jet Perforation
1984-11-07 Well Fluid changed to Crude Oil
1984-11-07 Well Mode changed to Pumping
1984-11-09 Perforation Treatment Performed - Cement Squeeze
1984-11-11 Perforation Treatment Performed - Jet Perforation
1985-02-22 Perforation Treatment Performed - Cement Squeeze
1985-02-26 Perforation Treatment Performed - Jet Perforation
1997-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-05-16 Plug Back Performed
1997-06-01 Well Fluid changed to Crude Oil
1997-06-01 Well Mode changed to Suspended
1997-07-14 Well Abandoned
1997-07-14 Well Fluid changed to Crude Oil
1997-07-14 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-11-15 Perforation 969.50 972.00 10
1982-06-16 Perforation 972.00 974.00 13
1984-11-09 Cement Squeeze 969.50 974.00 0
1984-11-11 Perforation 969.50 971.00 13
1985-02-22 Cement Squeeze 969.50 971.00 0
1985-02-26 Perforation 974.00 975.80 13
1997-05-16 Packing Device Capped w/Cement 956.00 964.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 101 0.0 0.0 0.0
1979 3528 0.0 0.0 0.0
1980 7794 0.0 0.0 0.0
1981 8259 0.0 0.0 0.0
1982 7246 0.0 0.0 0.0
1983 8259 0.0 0.0 0.0
1984 7156 0.0 0.0 0.0
1985 7130 0.0 0.0 0.0
1986 8562 0.0 0.0 0.0
1987 8674 0.0 0.0 0.0
1988 8693 0.0 0.0 0.0
1989 8589 0.0 0.0 0.0
1990 5447 0.0 0.0 0.0
1991 3910 0.0 0.0 0.0
1992 8732 0.0 0.0 0.0
1993 7938 0.0 0.0 0.0
1994 8661 0.0 0.0 0.0
1995 8348 0.0 0.0 0.0
1996 3801 0.0 0.0 0.0
1997 3187 0.0 0.0 0.0

For data sources see[5]

References