X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0064112506000

Well Details

Well ID: 0064112506000
Loading map...
Location: 00/06-25-006-11W4/0
Location Alias: 00/06-25-06-11 W4M
Location Alias 2: 00/06-25-006-11 W4/00
Country: Canada
Province: Alberta
Township: 006
Meridian: 4
Range: 11
Section: 25
County/Municipality: County of Forty Mile No. 8
Well Name: CLPT FOREMOST 6-25-6-11
Operator Name: Dundee Energy Limited
License Number: 0140663
License Date: 1989-08-15
License Status: RecCertified
Spud Date: 1989-09-21
Final Drill Date: 1989-09-22
Well Total Depth: 680.00 m
Surface Hole Latitude: 49.500896
Surface Hole Longitude: -111.363024

For data sources see[1][2]

Well History

Date Event
1989-08-15 Obtained License
1989-09-21 Surface Casing Operation Performed
1989-09-22 Finished Drilling
1989-09-22 Well Log Performed
1989-09-23 Production Casing Operation Performed
1989-09-23 Rig Released
1989-10-08 Well Log Performed
1989-12-04 Perforation Treatment Performed - Jet Perforation
1989-12-04 Well Log Performed
1990-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-01-22 Perforation Treatment Performed - Jet Perforation
1990-01-22 Plug Back Performed
1990-01-23 Perforation Treatment Performed - Fractured
1990-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-02-07 Perforation Treatment Performed - Jet Perforation
1990-02-07 Plug Back Performed
1990-02-07 Well Log Performed
1990-02-08 Perforation Treatment Performed - Fractured
1990-02-23 Well Mode changed to Drilled and Cased
1994-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-31 Plug Back Performed
1994-05-31 Well Abandoned
1994-05-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-12-04 Perforation 649.00 651.00 12
1990-02-08 Fracture 308.50 312.00 0
1994-05-31 Packing Device Capped w/Cement 290.00 300.00 0
1990-01-22 Packing Device Capped w/Cement 636.00 644.00 0
1990-01-22 Perforation 528.50 530.00 7
1990-01-22 Perforation 532.00 534.00 7
1990-01-22 Perforation 535.70 537.00 7
1990-01-22 Perforation 541.00 543.50 7
1990-01-23 Fracture 528.50 543.50 0
1990-02-07 Packing Device Capped w/Cement 512.00 520.00 0
1990-02-07 Perforation 308.50 312.00 13

For data sources see[4]



References