X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0054113010002

Well Details

Well ID: 0054113010002
Loading map...
Location: 00/10-30-005-11W4/2
Location Alias: 00/10-30-05-11 W4M
Location Alias 2: 00/10-30-005-11 W4/02
Country: Canada
Province: Alberta
Township: 005
Meridian: 4
Range: 11
Section: 30
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF SMICO 10-30-5-11
Operator Name: Pine Cliff Energy Ltd.
License Number: B0002184
License Date: 1948-07-03
License Status: Issued
Spud Date: 1948-07-03
Final Drill Date: 1948-07-30
Well Total Depth: 923.20 m
Surface Hole Latitude: 49.414949
Surface Hole Longitude: -111.473028

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-07-03 Obtained License
1948-07-08 Drill Stem Test Performed
1948-07-13 Drill Stem Test Performed
1948-07-14 Drill Stem Test Performed
1948-07-30 Finished Drilling
1948-07-30 Well Mode changed to Drilled and Cased
1948-08-01 Production Casing Operation Performed
1954-09-24 Perforation Treatment Performed - Acid Wash - No Pressure
1954-09-24 Perforation Treatment Performed - Fractured
1954-09-24 Perforation Treatment Performed - Jet Perforation
1975-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-03-11 Perforation Treatment Performed - Jet Perforation
1975-07-08 Well Began Production
1975-07-08 Well Fluid changed to Gas
1975-07-08 Well Mode changed to Flowing
1982-01-01 Well Fluid changed to Gas
1982-01-01 Well Mode changed to Suspended
1983-07-16 Well Fluid changed to Gas
1983-07-16 Well Mode changed to Flowing
1985-01-24 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-09-24 Perforation 623.00 623.90 26
1954-09-24 Perforation 623.90 625.10 26
1954-09-24 Perforation 620.00 620.90 26
1954-09-24 Acid Wash 620.00 625.10 0
1954-09-24 Fracture 620.00 625.10 0
1975-03-11 Packing Device Capped w/Cement 594.40 594.40 0
1975-03-11 Perforation 562.70 563.00 13
1985-01-24 Perforation 524.80 526.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 4035 0.0 0.0 0.0
1976 8529 0.0 0.0 0.0
1977 7734 0.0 0.0 0.0
1978 3825 0.0 0.0 0.0
1979 2425 0.0 0.0 0.0
1980 6443 0.0 0.0 0.0
1981 4514 0.0 0.0 0.0
1983 2764 0.0 0.0 0.0
1984 3550 0.0 0.0 0.0
1985 6115 0.0 0.0 0.0
1986 8234 0.0 0.0 0.0
1987 5474 0.0 0.0 0.0
1988 2706 0.0 0.0 0.0
1989 7565 0.0 0.0 0.0
1990 4906 0.0 0.0 0.0
1991 6868 0.0 0.0 0.0
1992 3996 0.0 0.0 0.0
1993 7105 0.0 0.0 0.0
1994 6752 0.0 0.0 0.0
1995 8332 0.0 0.0 0.0
1996 8592 0.0 0.0 0.0
1997 8486 0.0 0.0 0.0
1998 8559 0.0 0.0 0.0
1999 8731 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8721 0.0 0.0 0.0
2003 7945 0.0 0.0 0.0
2004 5816 0.0 0.0 0.0
2005 8731 0.0 0.0 0.0
2006 8753 0.0 0.0 0.0
2007 8544 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8687 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 7175 0.0 0.0 0.0
2016 2472 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References