X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0054101511000

Well Details

Well ID: 0054101511000
Loading map...
Location: 00/11-15-005-10W4/0
Location Alias: 00/11-15-05-10 W4M
Location Alias 2: 00/11-15-005-10 W4/00
Country: Canada
Province: Alberta
Township: 005
Meridian: 4
Range: 10
Section: 15
County/Municipality: County of Forty Mile No. 8
Well Name: CMG SMICO 11-15-5-10
Operator Name: Cenovus Energy Inc.
License Number: 0068336
License Date: 1978-02-08
License Status: RecCertified
Spud Date: 1978-02-20
Final Drill Date: 1978-02-25
Well Total Depth: 958.60 m
Surface Hole Latitude: 49.385371
Surface Hole Longitude: -111.275423

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-02-08 Obtained License
1978-02-25 Drill Stem Test Performed
1978-02-25 Finished Drilling
1978-02-26 Production Casing Operation Performed
1978-07-25 Perforation Treatment Performed - Jet Perforation
1978-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-07-30 Perforation Treatment Performed - Jet Perforation
1978-07-30 Perforation Treatment Performed - Selective Jet Perforations
1978-09-22 Well Mode changed to Drilled and Cased
1979-09-13 Well Began Production
1979-09-13 Well Fluid changed to Gas
1979-09-13 Well Mode changed to Flowing
1980-06-05 Well Fluid changed to Gas
1980-06-05 Well Mode changed to Suspended
1989-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-07-19 Plug Back Performed
1989-07-19 Well Abandoned
1989-07-19 Well Fluid changed to Gas
1989-07-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-07-25 Perforation 662.90 664.20 10
1978-07-25 Perforation 666.30 667.50 10
1978-07-25 Perforation 669.30 670.00 10
1978-07-30 Packing Device Capped w/Cement 640.10 649.20 0
1978-07-30 Selective Jet Perforations 553.50 567.20 0
1978-07-30 Perforation 555.30 557.80 3
1989-07-19 Packing Device Capped w/Cement 642.00 650.00 0
1989-07-19 Packing Device Capped w/Cement 540.00 548.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 2309 0.0 0.0 0.0
1980 2039 0.0 0.0 0.0

For data sources see[5]

References