X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0044291009002

Well Details

Well ID: 0044291009002
Loading map...
Location: 00/09-10-004-29W4/2
Location Alias: 00/09-10-04-29 W4M
Location Alias 2: 00/09-10-004-29 W4/02
Country: Canada
Province: Alberta
Township: 004
Meridian: 4
Range: 29
Section: 10
County/Municipality: Municipal District of Pincher Creek No. 9
Well Name: PENNINE PINCH CK 9-10-4-29
Operator Name: Nomad Exploration Ltd.
License Number: 0014135
License Date: 1957-10-16
License Status: Abandoned
Spud Date: 1959-03-02
Final Drill Date: 1964-06-03
Well Total Depth: 4845.40 m
Surface Hole Latitude: 49.285562
Surface Hole Longitude: -113.816534

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-10-16 Obtained License
1959-07-31 Liner Casing Operation Performed
1959-08-29 Perforation Treatment Performed - Open-Hole Completion
1959-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-14 Perforation Treatment Performed - Bullet Perforation
1964-02-05 Drill Stem Test Performed
1964-02-07 Perforation Treatment Performed - Cement Squeeze
1964-02-18 Drill Stem Test Performed
1964-03-17 Drill Stem Test Performed
1964-06-03 Finished Drilling
1964-06-03 Well Mode changed to Drilled and Cased
1964-06-06 Drill Stem Test Performed
1964-06-08 Drill Stem Test Performed
1964-06-09 Drill Stem Test Performed
1964-06-12 Drill Stem Test Performed
1964-06-17 Perforation Treatment Performed - Open-Hole Completion
1964-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-04 Perforation Treatment Performed - Acid Wash - No Pressure
1964-07-07 Drill Stem Test Performed
1964-07-30 Well Began Injection
1964-07-30 Well Fluid changed to Water
1964-07-30 Well Type changed to Disposal
1965-06-28 Perforation Treatment Performed - Acid Wash - No Pressure
1965-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-25 Plug Back Performed
1994-08-25 Well Fluid changed to Water
1994-08-25 Well Mode changed to Abandoned and Whipstocked
1994-08-25 Well Type changed to Disposal
2014-10-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-08-29 Open Hole/Barefoot Completion 3653.90 3736.80 0
1965-06-29 Acid Treatment 3996.50 4143.50 0
1965-10-20 Acid Treatment 3996.50 4143.50 0
1966-02-02 Acid Treatment 3996.50 4143.50 0
1994-08-25 Packing Device Capped w/Cement 3975.90 3983.90 0
1959-08-31 Acid Treatment 3653.90 3736.80 0
1959-09-01 Acid Treatment 3653.90 3736.80 0
1964-01-14 Bullet Perforation 3642.70 3644.80 0
1964-02-07 Cement Squeeze 3642.70 3644.80 0
1964-06-17 Open Hole/Barefoot Completion 3996.50 4143.50 0
1964-07-04 Acid Wash 3996.50 4143.50 0
1964-07-04 Acid Treatment 3996.50 4143.50 0
1965-06-28 Acid Wash 3996.50 4143.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0

For data sources see[5]

References