X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0044081013000

Well Details

Well ID: 0044081013000
Loading map...
Location: 00/13-10-004-08W4/0
Location Alias: 00/13-10-04-08 W4M
Location Alias 2: 00/13-10-004-08 W4/00
Country: Canada
Province: Alberta
Township: 004
Meridian: 4
Range: 08
Section: 10
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 13-10-4-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0322713
License Date: 2004-12-23
License Status: Issued
Spud Date: 2005-01-05
Final Drill Date: 2005-01-06
Well Total Depth: 410.00 m
Surface Hole Latitude: 49.287309
Surface Hole Longitude: -111.010508

For data sources see[1][2]

Well History

Date Event
2004-12-23 Obtained License
2005-01-06 Finished Drilling
2005-01-06 Surface Casing Operation Performed
2005-01-06 Well Mode changed to Drilled and Cased
2005-01-07 Production Casing Operation Performed
2005-01-07 Rig Released
2005-01-07 Well Log Performed
2005-01-10 Well Log Performed
2005-01-17 Perforation Treatment Performed - Jet Perforation
2005-01-17 Well Log Performed
2005-01-21 Perforation Treatment Performed - Jet Perforation
2005-01-29 Perforation Treatment Performed - Jet Perforation
2005-02-02 Perforation Treatment Performed - Jet Perforation
2005-02-24 Perforation Treatment Performed - Fractured
2005-03-08 Well Began Production
2005-03-08 Well Fluid changed to Gas
2005-03-08 Well Mode changed to Flowing
2005-04-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-01-17 Perforation 362.00 365.00 13
2005-01-17 Perforation 354.00 357.00 13
2005-01-21 Perforation 341.50 344.50 13
2005-01-29 Perforation 310.00 313.00 13
2005-02-02 Perforation 295.00 298.00 13
2005-02-24 Fracture 341.50 344.50 0
2005-02-24 Fracture 310.00 313.00 0
2005-02-24 Fracture 295.00 298.00 0
2005-04-08 Packing Device Capped w/Cement 352.00 360.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 6274 0.0 0.0 0.0
2006 6677 0.0 0.0 0.0
2007 7739 0.0 0.0 0.0
2008 8711 0.0 0.0 0.0
2009 8687 0.0 0.0 0.0
2010 7295 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References