X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0034072010000

Well Details

Well ID: 0034072010000
Loading map...
Location: 00/10-20-003-07W4/0
Location Alias: 00/10-20-03-07 W4M
Location Alias 2: 00/10-20-003-07 W4/00
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 07
Section: 20
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 10-20-3-7
Operator Name: Pine Cliff Energy Ltd.
License Number: 0035200
License Date: 1968-11-18
License Status: Issued
Spud Date: 1968-12-01
Final Drill Date: 1968-12-06
Well Total Depth: 969.30 m
Surface Hole Latitude: 49.228290
Surface Hole Longitude: -110.908552

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-11-18 Obtained License
1968-12-06 Drill Stem Test Performed
1968-12-06 Finished Drilling
1968-12-06 Well Mode changed to Drilled and Cased
1968-12-07 Drill Stem Test Performed
1968-12-08 Production Casing Operation Performed
1969-04-22 Perforation Treatment Performed - Jet Perforation
1969-07-02 Well Began Production
1969-07-02 Well Fluid changed to Gas
1969-07-02 Well Mode changed to Flowing
1969-11-18 Perforation Treatment Performed - Jet Perforation
1969-11-19 Perforation Treatment Performed - Cement Squeeze
1969-11-20 Perforation Treatment Performed - Jet Perforation
1969-11-21 Perforation Treatment Performed - Jet Perforation
1969-11-24 Perforation Treatment Performed - Jet Perforation
2007-03-01 Perforation Treatment Performed - Jet Perforation
2007-03-01 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-04-22 Perforation 655.60 658.70 7
1969-11-18 Perforation 663.20 663.50 13
1969-11-19 Cement Squeeze 655.60 663.50 0
1969-11-20 Perforation 649.20 649.50 13
1969-11-21 Perforation 656.20 657.80 13
1969-11-24 Perforation 655.30 656.50 7
2007-03-01 Perforation 642.00 645.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 3080 0.0 0.0 0.0
1970 7569 0.0 0.0 0.0
1971 6950 0.0 0.0 0.0
1972 7300 0.0 0.0 0.0
1973 8457 0.0 0.0 0.0
1974 8526 0.0 0.0 0.0
1975 8755 0.0 0.0 0.0
1976 3524 0.0 0.0 0.0
1977 8244 0.0 0.0 0.0
1978 4204 0.0 0.0 0.0
1979 8242 0.0 0.0 0.0
1980 8326 0.0 0.0 0.0
1981 5717 0.0 0.0 0.0
1982 6176 0.0 0.0 0.0
1983 6892 0.0 0.0 0.0
1984 8584 0.0 0.0 0.0
1985 8642 0.0 0.0 0.0
1986 8066 0.0 0.0 0.0
1987 5166 0.0 0.0 0.0
1988 2645 0.0 0.0 0.0
1989 8364 0.0 0.0 0.0
1990 5745 0.0 0.0 0.0
1991 7569 0.0 0.0 0.0
1992 4849 0.0 0.0 0.0
1993 7213 0.0 0.0 0.0
1994 6748 0.0 0.0 0.0
1995 8520 0.0 0.0 0.0
1996 8580 0.0 0.0 0.0
1997 8515 0.0 0.0 0.0
1998 8612 0.0 0.0 0.0
1999 8712 0.0 0.0 0.0
2000 8754 0.0 0.0 0.0
2001 8666 0.0 0.0 0.0
2002 8491 0.0 0.0 0.0
2003 8722 0.0 0.0 0.0
2004 8679 0.0 0.0 0.0
2005 8638 0.0 0.0 0.0
2006 8756 0.0 0.0 0.0
2007 6912 0.0 0.0 0.0
2008 8771 0.0 0.0 0.0
2009 8255 0.0 0.0 0.0
2010 8231 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 7247 0.0 0.0 0.0
2019 3672 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References