If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0024251501002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/01-15-002-25W4/2 | |
| Location Alias: 00/01-15-02-25 W4M | |
| Location Alias 2: 00/01-15-002-25 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 002 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 15 | |
| County/Municipality: Cardston County | |
| Well Name: ACL AETNA 1-15-2-25 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0363704 | |
| License Date: 2006-09-27 | |
| License Status: RecCertified | |
| Spud Date: 2006-10-10 | |
| Final Drill Date: 2006-10-15 | |
| Well Total Depth: 1580.00 m | |
| Surface Hole Latitude: 49.119072 | |
| Surface Hole Longitude: -113.257546 |
| Date | Event |
|---|---|
| 2006-09-27 | Obtained License |
| 2006-10-10 | Direction Drilling Operation Performed - Deviate |
| 2006-10-11 | Surface Casing Operation Performed |
| 2006-10-15 | Finished Drilling |
| 2006-10-15 | Well Log Performed |
| 2006-10-15 | Well Mode changed to Drilled and Cased |
| 2006-10-16 | Well Log Performed |
| 2006-10-18 | Production Casing Operation Performed |
| 2006-10-18 | Rig Released |
| 2006-11-24 | Perforation Treatment Performed - Jet Perforation |
| 2007-01-04 | Perforation Treatment Performed - Fractured |
| 2007-02-02 | Well Log Performed |
| 2008-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-01-19 | Plug Back Performed |
| 2008-01-19 | Well Mode changed to Abandoned Zone |
| 2008-01-20 | Well Log Performed |
| 2008-02-23 | Well Abandoned |
| 2008-02-23 | Well Mode changed to Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2006-10-10 | 110.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-11-24 | Perforation | 1445.50 | 1447.50 | 17 |
| 2006-11-24 | Perforation | 1469.00 | 1471.50 | 17 |
| 2006-11-24 | Perforation | 1485.00 | 1487.00 | 17 |
| 2006-11-24 | Perforation | 1295.50 | 1297.50 | 17 |
| 2006-11-24 | Perforation | 1317.00 | 1318.50 | 17 |
| 2007-01-04 | Fracture | 1445.50 | 1487.00 | 0 |
| 2007-01-04 | Fracture | 1295.50 | 1318.50 | 0 |
| 2008-01-19 | Packing Device Capped w/Cement | 1430.00 | 1438.00 | 0 |
| 2008-01-19 | Packing Device Capped w/Cement | 1279.00 | 1287.00 | 0 |
For data sources see[5]