If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0024211614000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.116645,"lon":-112.75681,"icon":""}]} |
| Location: 00/14-16-002-21W4/0 | |
| Location Alias: 00/14-16-02-21 W4M | |
| Location Alias 2: 00/14-16-002-21 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 002 | |
| Meridian: 4 | |
| Range: 21 | |
| Section: 16 | |
| County/Municipality: Cardston County | |
| Well Name: CPEC REAGAN 14-16-2-21 | |
| Operator Name: Crescent Point Energy Corp. | |
| License Number: 0447725 | |
| License Date: 2012-08-14 | |
| License Status: Abandoned | |
| Spud Date: 2012-08-29 | |
| Final Drill Date: 2012-10-03 | |
| Well Total Depth: 3128.00 m | |
| Surface Hole Latitude: 49.116645 | |
| Surface Hole Longitude: -112.756810 |
| Date | Event |
|---|---|
| 2012-08-14 | Obtained License |
| 2012-08-30 | Surface Casing Operation Performed |
| 2012-09-03 | Direction Drilling Operation Performed - Deviate |
| 2012-09-10 | Direction Drilling Operation Performed - Horizontal |
| 2012-09-11 | Well Log Performed |
| 2012-09-12 | Intermediate Casing Operation Performed |
| 2012-10-03 | Finished Drilling |
| 2012-10-03 | Well Log Performed |
| 2012-10-03 | Well Mode changed to Drilled and Cased |
| 2012-10-04 | Liner Casing Operation Performed |
| 2012-10-05 | Rig Released |
| 2012-10-17 | Well Log Performed |
| 2012-10-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-12-01 | Well Began Production |
| 2012-12-01 | Well Fluid changed to Crude Oil |
| 2012-12-01 | Well Mode changed to Pumping |
| 2016-08-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-08-11 | Plug Back Performed |
| 2016-08-11 | Well Fluid changed to Crude Oil |
| 2016-08-11 | Well Mode changed to Abandoned Zone |
| 2016-08-16 | Well Abandoned |
| 2016-08-16 | Well Fluid changed to Crude Oil |
| 2016-08-16 | Well Mode changed to Abandoned |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-08-29 | Savanna Drilling Corp. | 628 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-09-03 | 1548.80 | Deviate (5 - 79 degrees) |
| 2012-09-10 | 1876.60 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-10-26 | Multi-Stage Fracture | 3101.30 | 3101.50 | 0 |
| 2012-10-26 | Multi-Stage Fracture | 2664.30 | 2664.50 | 0 |
| 2012-10-26 | Multi-Stage Fracture | 2620.40 | 2620.60 | 0 |
| 2012-10-26 | Multi-Stage Fracture | 2576.40 | 2576.60 | 0 |
| 2012-10-26 | Multi-Stage Fracture | 2519.50 | 2519.70 | 0 |
| 2012-10-27 | Multi-Stage Fracture | 2475.50 | 2475.70 | 0 |
| 2012-10-27 | Multi-Stage Fracture | 2418.60 | 2418.80 | 0 |
| 2012-10-27 | Multi-Stage Fracture | 2375.30 | 2375.50 | 0 |
| 2012-10-27 | Multi-Stage Fracture | 2331.40 | 2331.60 | 0 |
| 2012-10-27 | Multi-Stage Fracture | 2274.50 | 2274.70 | 0 |
| 2012-10-27 | Multi-Stage Fracture | 2230.80 | 2231.00 | 0 |
| 2012-10-26 | Multi-Stage Fracture | 3055.00 | 3055.20 | 0 |
| 2012-10-27 | Multi-Stage Fracture | 2174.30 | 2174.50 | 0 |
| 2012-10-27 | Multi-Stage Fracture | 2130.20 | 2130.40 | 0 |
| 2012-10-27 | Multi-Stage Fracture | 2086.10 | 2086.30 | 0 |
| 2012-10-27 | Multi-Stage Fracture | 2029.50 | 2029.70 | 0 |
| 2012-10-27 | Multi-Stage Fracture | 1985.40 | 1985.60 | 0 |
| 2012-10-27 | Multi-Stage Fracture | 1941.30 | 1941.50 | 0 |
| 2016-08-11 | Packing Device Capped w/Cement | 1832.00 | 1882.00 | 0 |
| 2012-10-26 | Multi-Stage Fracture | 3011.00 | 3011.30 | 0 |
| 2012-10-26 | Multi-Stage Fracture | 2954.10 | 2954.30 | 0 |
| 2012-10-26 | Multi-Stage Fracture | 2910.00 | 2910.20 | 0 |
| 2012-10-26 | Multi-Stage Fracture | 2865.90 | 2866.10 | 0 |
| 2012-10-26 | Multi-Stage Fracture | 2809.20 | 2809.40 | 0 |
| 2012-10-26 | Multi-Stage Fracture | 2765.10 | 2765.30 | 0 |
| 2012-10-26 | Multi-Stage Fracture | 2708.30 | 2708.50 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 640 | 0.0 | 0.0 | 0.0 |
| 2013 | 8675 | 0.0 | 0.0 | 0.0 |
| 2014 | 7171 | 0.0 | 0.0 | 0.0 |
| 2015 | 3478 | 0.0 | 0.0 | 0.0 |
| 2016 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-10-05 | No Incident Encountered | 0.00 | 0.00 |
| 2012-12-02 | No Incident Encountered | 0.00 | 0.00 |
| 2016-08-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]