X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024092415003

Well Details

Well ID: 0024092415003
Loading map...
Location: 00/15-24-002-09W4/3
Location Alias: 00/15-24-02-09 W4M
Location Alias 2: 00/15-24-002-09 W4/03
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 09
Section: 24
County/Municipality: County of Forty Mile No. 8
Well Name: NEO PENDOR 15-24-2-9
Operator Name: NEO Exploration Inc.
License Number: 0363662
License Date: 2006-09-27
License Status: Issued
Spud Date: 2006-10-10
Final Drill Date: 2006-10-12
Well Total Depth: 946.00 m
Surface Hole Latitude: 49.144257
Surface Hole Longitude: -111.082869

For data sources see[1][2]

Well History

Date Event
2006-09-27 Obtained License
2006-10-06 Surface Casing Operation Performed
2006-10-12 Finished Drilling
2006-10-12 Well Mode changed to Drilled and Cased
2006-10-13 Production Casing Operation Performed
2006-10-13 Rig Released
2006-10-13 Well Log Performed
2006-10-25 Perforation Treatment Performed - Jet Perforation
2006-10-26 Perforation Treatment Performed - Jet Perforation
2006-11-04 Perforation Treatment Performed - Cement Plug
2006-11-04 Plug Back Performed
2006-11-05 Perforation Treatment Performed - Jet Perforation
2006-11-07 Perforation Treatment Performed - Fractured
2006-11-11 Perforation Treatment Performed - Jet Perforation
2006-11-12 Perforation Treatment Performed - Fractured
2006-11-12 Perforation Treatment Performed - Jet Perforation
2006-11-15 Perforation Treatment Performed - Jet Perforation
2006-11-16 Perforation Treatment Performed - Fractured
2006-11-29 Perforation Treatment Performed - Casing Patch (Over Perfs)
2007-01-16 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-25 Perforation 867.00 869.00 13
2006-11-12 Perforation 346.00 347.00 13
2006-11-12 Fracture 346.00 351.30 0
2006-11-15 Perforation 306.00 308.50 13
2006-11-16 Fracture 306.00 308.50 0
2006-11-29 Casing Patch 306.00 308.50 0
2006-10-26 Perforation 858.50 859.50 13
2006-11-04 Cement Plug 847.00 855.00 0
2006-11-05 Perforation 526.00 527.00 13
2006-11-05 Perforation 518.50 520.50 13
2006-11-05 Perforation 514.50 515.50 13
2006-11-07 Fracture 514.50 527.00 0
2006-11-11 Perforation 350.00 351.50 13
2006-11-12 Perforation 351.50 353.00 13

For data sources see[4]



References