X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024073506000

Well Details

Well ID: 0024073506000
Loading map...
Location: 00/06-35-002-07W4/0
Location Alias: 00/06-35-02-07 W4M
Location Alias 2: 00/06-35-002-07 W4/00
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 07
Section: 35
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 6-35-2-7
Operator Name: Pine Cliff Energy Ltd.
License Number: 0044822
License Date: 1973-01-16
License Status: Issued
Spud Date: 1973-01-24
Final Drill Date: 1973-01-29
Well Total Depth: 1042.40 m
Surface Hole Latitude: 49.163872
Surface Hole Longitude: -110.845013

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-01-16 Obtained License
1973-01-29 Drill Stem Test Performed
1973-01-29 Finished Drilling
1973-01-29 Well Mode changed to Drilled and Cased
1973-01-30 Drill Stem Test Performed
1973-01-31 Production Casing Operation Performed
1973-03-23 Perforation Treatment Performed - Jet Perforation
1973-08-21 Well Began Production
1973-08-21 Well Fluid changed to Gas
1973-08-21 Well Mode changed to Flowing
1977-01-27 Well Fluid changed to Gas
1977-01-27 Well Mode changed to Suspended
1978-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-08-30 Perforation Treatment Performed - Jet Perforation
1987-02-15 Perforation Treatment Performed - Jet Perforation
1987-02-15 Perforation Treatment Performed - Remedial Casing
1987-02-18 Perforation Treatment Performed - Jet Perforation
1992-03-27 Well Fluid changed to Gas
1992-03-27 Well Mode changed to Flowing
2007-05-16 Perforation Treatment Performed - Jet Perforation
2007-05-16 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-03-23 Perforation 715.70 717.20 13
1978-08-28 Packing Device Capped w/Cement 715.70 717.20 0
1978-08-30 Perforation 715.40 716.90 10
1987-02-15 Perforation 717.50 718.50 13
1987-02-15 Perforation 721.50 722.50 13
1987-02-15 Remedial Casing Cementing 715.40 722.50 0
1987-02-18 Perforation 715.40 716.40 13
2007-05-16 Perforation 702.00 705.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 3143 0.0 0.0 0.0
1974 8341 0.0 0.0 0.0
1975 6522 0.0 0.0 0.0
1992 2683 0.0 0.0 0.0
1993 6986 0.0 0.0 0.0
1994 6764 0.0 0.0 0.0
1995 8377 0.0 0.0 0.0
1996 8643 0.0 0.0 0.0
1997 8516 0.0 0.0 0.0
1998 8758 0.0 0.0 0.0
1999 8754 0.0 0.0 0.0
2000 8698 0.0 0.0 0.0
2001 8687 0.0 0.0 0.0
2002 8513 0.0 0.0 0.0
2003 8210 0.0 0.0 0.0
2004 8012 0.0 0.0 0.0
2005 8595 0.0 0.0 0.0
2006 6565 0.0 0.0 0.0
2007 8379 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8423 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References