If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0014282007000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.049241,"lon":-113.70763,"icon":""}]} |
| Location: 00/07-20-001-28W4/0 | |
| Location Alias: 00/07-20-01-28 W4M | |
| Location Alias 2: 00/07-20-001-28 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 001 | |
| Meridian: 4 | |
| Range: 28 | |
| Section: 20 | |
| County/Municipality: Blood 148A | |
| Well Name: SHELL CHIEF MOUNTAIN 7-20-1-28 | |
| Operator Name: Shell Canada Limited | |
| License Number: 0018958 | |
| License Date: 1960-04-27 | |
| License Status: Re-Entered | |
| Spud Date: 1960-06-16 | |
| Final Drill Date: 1960-11-25 | |
| Well Total Depth: 3956.30 m | |
| Surface Hole Latitude: 49.049241 | |
| Surface Hole Longitude: -113.707630 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1960-04-27 | Obtained License |
| 1960-07-30 | Well Log Performed |
| 1960-11-25 | Finished Drilling |
| 1960-11-29 | Drill Stem Test Performed |
| 1960-12-03 | Perforation Treatment Performed - Open-Hole Completion |
| 1960-12-03 | Production Casing Operation Performed |
| 1960-12-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1960-12-15 | Perforation Treatment Performed - Jet Perforation |
| 1960-12-19 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1960-12-27 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1960-12-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1960-12-30 | Perforation Treatment Performed - Bullet Perforation |
| 1960-12-30 | Perforation Treatment Performed - Jet Perforation |
| 1961-01-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1961-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1961-09-20 | Well Mode changed to Drilled and Cased |
| 1963-09-04 | Well Began Production |
| 1963-09-04 | Well Fluid changed to Gas |
| 1963-09-04 | Well Mode changed to Flowing |
| 1968-08-15 | Well Fluid changed to Gas |
| 1968-08-15 | Well Mode changed to Suspended |
| 1972-09-22 | Perforation Treatment Performed - Cement Plug |
| 1972-09-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1990-09-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1990-09-25 | Plug Back Performed |
| 1990-09-25 | Well Abandoned |
| 1990-09-25 | Well Fluid changed to Gas |
| 1990-09-25 | Well Mode changed to Abandoned |
| 1990-09-26 | Well Fluid changed to Gas |
| 1990-09-26 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1960-12-03 | Open Hole/Barefoot Completion | 3867.90 | 3956.30 | 0 |
| 1960-12-30 | Perforation | 3759.40 | 3766.70 | 7 |
| 1960-12-30 | Perforation | 3772.50 | 3776.50 | 7 |
| 1960-12-30 | Perforation | 3779.50 | 3786.80 | 7 |
| 1961-01-01 | Acid Treatment | 3735.00 | 3786.80 | 0 |
| 1961-02-20 | Acid Treatment | 3735.00 | 3786.80 | 0 |
| 1961-02-20 | Acid Treatment | 3735.00 | 3786.80 | 0 |
| 1972-09-22 | Cement Plug | 3789.00 | 3794.20 | 0 |
| 1972-09-29 | Acid Treatment | 3735.00 | 3786.80 | 0 |
| 1990-09-25 | Packing Device Capped w/Cement | 3675.00 | 3683.00 | 0 |
| 1990-09-25 | Packing Device Capped w/Cement | 3482.00 | 3490.00 | 0 |
| 1960-12-10 | Acid Treatment | 3867.90 | 3956.30 | 0 |
| 1960-12-15 | Perforation | 3816.40 | 3830.70 | 7 |
| 1960-12-15 | Perforation | 3842.00 | 3849.90 | 7 |
| 1960-12-19 | Acid Wash | 3816.40 | 3849.90 | 0 |
| 1960-12-27 | Acid Wash | 3816.40 | 3849.90 | 0 |
| 1960-12-30 | Packing Device Capped w/Cement | 3799.30 | 3799.30 | 0 |
| 1960-12-30 | Bullet Perforation | 3738.40 | 3783.80 | 3 |
| 1960-12-30 | Perforation | 3735.00 | 3744.80 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1968 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]