X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014190601000

Well Details

Well ID: 0014190601000
Loading map...
Location: 00/01-06-001-19W4/0
Location Alias: 00/01-06-01-19 W4M
Location Alias 2: 00/01-06-001-19 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 19
Section: 06
County/Municipality: Cardston County
Well Name: GLENCOE 1-6 HZ REAGAN 2-6-1-19
Operator Name: Glencoe Resources Ltd.
License Number: 0014164
License Date: 1957-10-23
License Status: Abandoned
Spud Date: 1957-11-04
Final Drill Date: 1957-11-23
Well Total Depth: 1101.90 m
Surface Hole Latitude: 49.001021
Surface Hole Longitude: -112.524550

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-10-23 Obtained License
1957-11-22 Drill Stem Test Performed
1957-11-23 Finished Drilling
1957-11-23 Well Mode changed to Drilled and Cased
1957-11-24 Perforation Treatment Performed - Open-Hole Completion
1957-11-24 Production Casing Operation Performed
1958-01-16 Well Began Production
1958-01-16 Well Fluid changed to Crude Oil
1958-01-16 Well Mode changed to Pumping
1964-11-03 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-02-01 Well Fluid changed to Crude Oil
1972-02-01 Well Mode changed to Suspended
1972-11-01 Well Fluid changed to Crude Oil
1972-11-01 Well Mode changed to Pumping
1972-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-02 Perforation Treatment Performed - Jet Perforation
1985-01-01 Well Fluid changed to Crude Oil
1985-01-01 Well Mode changed to Suspended
1987-01-27 Well Fluid changed to Crude Oil
1987-01-27 Well Mode changed to Pumping
1998-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-20 Plug Back Performed
1998-11-20 Well Fluid changed to Crude Oil
1998-11-20 Well Log Performed
1998-11-20 Well Mode changed to Abandoned Zone
1998-12-02 Perforation Treatment Performed - Bridge Plug No Cement Required
1998-12-02 Plug Back Performed
1998-12-02 Well Fluid changed to Crude Oil
1998-12-02 Well Mode changed to Abandoned and Whipstocked
2020-02-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-11-24 Open Hole/Barefoot Completion 1099.10 1101.90 0
1964-11-03 Hydra Jet Perforation 1097.30 1099.70 0
1964-11-03 Acid Treatment 1097.30 1101.90 0
1967-06-30 Acid Treatment 1097.30 1099.70 0
1972-11-02 Perforation 1091.20 1095.10 7
1972-11-02 Acid Treatment 1091.20 1101.90 0
1998-11-20 Packing Device Capped w/Cement 1077.00 1085.00 0
1998-12-02 Bridge Plug, No Cement 1048.40 1048.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6204 0.0 0.0 0.0
1968 7416 0.0 0.0 0.0
1969 8211 0.0 0.0 0.0
1970 6404 0.0 0.0 0.0
1972 440 0.0 0.0 0.0
1973 7616 0.0 0.0 0.0
1974 2388 0.0 0.0 0.0
1975 2127 0.0 0.0 0.0
1976 5850 0.0 0.0 0.0
1977 7274 0.0 0.0 0.0
1978 3967 0.0 0.0 0.0
1979 3190 0.0 0.0 0.0
1980 3660 0.0 0.0 0.0
1981 6091 0.0 0.0 0.0
1982 3335 0.0 0.0 0.0
1983 6926 0.0 0.0 0.0
1984 6207 0.0 0.0 0.0
1987 6485 0.0 0.0 0.0
1988 7257 0.0 0.0 0.0
1989 7432 0.0 0.0 0.0
1990 4939 0.0 0.0 0.0
1991 4265 0.0 0.0 0.0
1992 7795 0.0 0.0 0.0
1993 7242 0.0 0.0 0.0
1994 7810 0.0 0.0 0.0
1995 7372 0.0 0.0 0.0
1996 1399 0.0 0.0 0.0
1997 2484 0.0 0.0 0.0
1998 5288 0.0 0.0 0.0

For data sources see[5]

References