If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014170106D00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.006065,"lon":-112.154471,"icon":""}]} |
Location: D0/06-01-001-17W4/0 | |
Location Alias: D0/06-01-01-17 W4M | |
Location Alias 2: D0/06-01-001-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 17 | |
Section: 01 | |
County/Municipality: County of Warner No. 5 | |
Well Name: TS PETE ET AL RED COULEE 6D-1-1-17 | |
Operator Name: Tri-Star Petroleum Inc. | |
License Number: 0042499 | |
License Date: 1972-05-11 | |
License Status: RecCertified | |
Spud Date: 1972-05-16 | |
Final Drill Date: 1972-05-22 | |
Well Total Depth: 816.90 m | |
Surface Hole Latitude: 49.006065 | |
Surface Hole Longitude: -112.154471 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1972-05-11 | Obtained License |
1972-05-22 | Finished Drilling |
1972-05-22 | Well Mode changed to Drilled and Cased |
1972-05-23 | Production Casing Operation Performed |
1972-05-26 | Perforation Treatment Performed - Jet Perforation |
1972-06-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-06-03 | Well Began Production |
1972-06-03 | Well Fluid changed to Crude Oil |
1972-06-03 | Well Mode changed to Pumping |
1972-07-13 | Perforation Treatment Performed - Jet Perforation |
1989-12-31 | Well Fluid changed to Crude Oil |
1989-12-31 | Well Mode changed to Suspended |
2000-01-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-01-15 | Plug Back Performed |
2000-01-15 | Well Log Performed |
2000-01-29 | Well Abandoned |
2000-01-29 | Well Fluid changed to Crude Oil |
2000-01-29 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1972-05-26 | Perforation | 780.60 | 783.60 | 7 |
1972-06-01 | Acid Treatment | 780.60 | 783.60 | 0 |
1972-07-13 | Perforation | 783.60 | 785.80 | 13 |
2000-01-15 | Packing Device Capped w/Cement | 465.00 | 773.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1972 | 4842 | 0.0 | 0.0 | 0.0 |
1973 | 8634 | 0.0 | 0.0 | 0.0 |
1974 | 8586 | 0.0 | 0.0 | 0.0 |
1975 | 8651 | 0.0 | 0.0 | 0.0 |
1976 | 8542 | 0.0 | 0.0 | 0.0 |
1977 | 7162 | 0.0 | 0.0 | 0.0 |
1978 | 408 | 0.0 | 0.0 | 0.0 |
1979 | 1944 | 0.0 | 0.0 | 0.0 |
1980 | 8194 | 0.0 | 0.0 | 0.0 |
1981 | 8043 | 0.0 | 0.0 | 0.0 |
1982 | 2921 | 0.0 | 0.0 | 0.0 |
1983 | 7363 | 0.0 | 0.0 | 0.0 |
1984 | 8172 | 0.0 | 0.0 | 0.0 |
1985 | 6736 | 0.0 | 0.0 | 0.0 |
1986 | 602 | 0.0 | 0.0 | 0.0 |
1989 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]