X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014160508B00

Well Details

Well ID: 0014160508B00
Loading map...
Location: B0/08-05-001-16W4/0
Location Alias: B0/08-05-01-16 W4M
Location Alias 2: B0/08-05-001-16 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 16
Section: 05
County/Municipality: County of Warner No. 5
Well Name: CPEC COUTTS 8-5-1-16
Operator Name: Crescent Point Energy Corp.
License Number: 0176326
License Date: 1995-02-23
License Status: Suspension
Spud Date: 1995-02-28
Final Drill Date: 1995-03-03
Well Total Depth: 815.00 m
Surface Hole Latitude: 49.003940
Surface Hole Longitude: -112.101620

For data sources see[1][2]

Well History

Date Event
1995-02-23 Obtained License
1995-03-01 Surface Casing Operation Performed
1995-03-03 Finished Drilling
1995-03-03 Well Mode changed to Drilled and Cased
1995-03-04 Drill Stem Test Performed
1995-03-04 Well Log Performed
1995-03-05 Drill Stem Test Performed
1995-03-06 Drill Stem Test Performed
1995-03-07 Production Casing Operation Performed
1995-03-08 Rig Released
1995-03-16 Perforation Treatment Performed - Jet Perforation
1995-03-16 Well Log Performed
1995-03-17 Perforation Treatment Performed - Jet Perforation
1995-03-17 Well Log Performed
1995-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-20 Perforation Treatment Performed - Jet Perforation
1995-03-20 Well Log Performed
1995-03-21 Perforation Treatment Performed - Fractured
1995-05-01 Well Began Production
1995-05-01 Well Fluid changed to Crude Oil
1995-05-01 Well Mode changed to Pumping
2001-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-11 Perforation Treatment Performed - Jet Perforation
2001-07-11 Well Fluid changed to Crude Oil
2001-07-11 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-03-16 Perforation 788.30 788.80 13
1995-03-17 Perforation 786.00 787.30 13
1995-03-18 Acid Treatment 786.00 788.80 0
1995-03-20 Perforation 781.00 783.00 13
1995-03-21 Fracture 781.00 783.00 0
2001-07-11 Packing Device Capped w/Cement 754.00 762.00 0
2001-07-11 Perforation 738.50 739.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4877 0.0 0.0 0.0
1996 5716 0.0 0.0 0.0
1997 6498 0.0 0.0 0.0
1998 6963 0.0 0.0 0.0
1999 6570 0.0 0.0 0.0
2000 4881 0.0 0.0 0.0
2001 2473 0.0 0.0 0.0

For data sources see[5]

References