X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014160504000

Well Details

Well ID: 0014160504000
Loading map...
Location: 00/04-05-001-16W4/0
Location Alias: 00/04-05-01-16 W4M
Location Alias 2: 00/04-05-001-16 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 16
Section: 05
County/Municipality: County of Warner No. 5
Well Name: NORTHCOR RED COULEE 4-5-1-16
Operator Name: Kanati Energy Incorporated
License Number: 0129687
License Date: 1987-10-27
License Status: RecCertified
Spud Date: 1988-02-06
Final Drill Date: 1988-02-11
Well Total Depth: 797.00 m
Surface Hole Latitude: 49.001344
Surface Hole Longitude: -112.116565

For data sources see[1][2]

Well History

Date Event
1987-10-27 Obtained License
1988-02-07 Surface Casing Operation Performed
1988-02-11 Finished Drilling
1988-02-11 Well Log Performed
1988-02-11 Well Mode changed to Drilled and Cased
1988-02-12 Drill Stem Test Performed
1988-02-13 Production Casing Operation Performed
1988-02-13 Rig Released
1988-02-23 Perforation Treatment Performed - Jet Perforation
1988-02-23 Well Log Performed
1988-02-24 Perforation Treatment Performed - Acid Wash - No Pressure
1988-02-25 Perforation Treatment Performed - Fractured
1988-02-25 Well Log Performed
1988-02-28 Well Log Performed
1988-03-02 Perforation Treatment Performed - Abrasa-Jet Perforation
1988-03-02 Well Log Performed
1988-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-03-03 Well Log Performed
1988-04-04 Perforation Treatment Performed - Jet Perforation
1988-04-04 Well Log Performed
1988-12-14 Perforation Treatment Performed - Jet Perforation
1988-12-15 Perforation Treatment Performed - Jet Perforation
1988-12-15 Well Log Performed
1988-12-17 Perforation Treatment Performed - Fractured
1989-01-27 Well Began Production
1989-01-27 Well Fluid changed to Crude Oil
1989-01-27 Well Mode changed to Pumping
1991-05-30 Well Fluid changed to Crude Oil
1991-05-30 Well Mode changed to Suspended
1993-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-12 Perforation Treatment Performed - Jet Perforation
1993-11-12 Plug Back Performed
1993-11-12 Well Fluid changed to Crude Oil
1993-11-12 Well Mode changed to Abandoned Zone
1993-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-14 Plug Back Performed
1993-11-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-23 Perforation 761.00 766.50 13
1988-12-17 Fracture 761.00 766.50 0
1993-11-12 Packing Device Capped w/Cement 750.00 758.00 0
1993-11-12 Perforation 727.50 731.70 13
1993-11-12 Perforation 731.80 736.00 13
1993-11-14 Packing Device Capped w/Cement 712.00 720.00 0
1988-02-23 Perforation 768.50 769.50 13
1988-02-24 Acid Wash 761.00 769.50 0
1988-02-25 Fracture 761.00 769.50 0
1988-03-02 Hydra Jet Perforation 762.00 765.00 0
1988-03-03 Packing Device Capped w/Cement 748.50 756.50 0
1988-04-04 Perforation 725.50 727.50 13
1988-12-14 Perforation 761.00 766.50 13
1988-12-15 Perforation 768.50 769.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1128 0.0 0.0 0.0

For data sources see[5]

References