X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014090715000

Well Details

Well ID: 0014090715000
Loading map...
Location: 00/15-07-001-09W4/0
Location Alias: 00/15-07-01-09 W4M
Location Alias 2: 00/15-07-001-09 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 09
Section: 07
County/Municipality: County of Forty Mile No. 8
Well Name: CBEI ET AL ADEN 15-7-1-9
Operator Name: Pine Cliff Energy Ltd.
License Number: 0203468
License Date: 1997-07-16
License Status: Suspension
Spud Date: 1997-07-30
Final Drill Date: 1997-08-03
Well Total Depth: 1045.00 m
Surface Hole Latitude: 49.027510
Surface Hole Longitude: -111.194936

For data sources see[1][2]

Well History

Date Event
1997-07-16 Obtained License
1997-07-31 Surface Casing Operation Performed
1997-08-03 Finished Drilling
1997-08-03 Well Log Performed
1997-08-03 Well Mode changed to Drilled and Cased
1997-08-04 Drill Stem Test Performed
1997-08-04 Well Log Performed
1997-08-05 Production Casing Operation Performed
1997-08-05 Rig Released
1997-09-30 Perforation Treatment Performed - Jet Perforation
1997-09-30 Well Log Performed
1997-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-03 Perforation Treatment Performed - Jet Perforation
1997-10-03 Plug Back Performed
1997-10-03 Well Log Performed
1998-04-23 Well Began Production
1998-04-23 Well Fluid changed to Gas
1998-04-23 Well Mode changed to Flowing
2003-02-03 Well Fluid changed to Gas
2003-02-03 Well Mode changed to Closed
2003-02-04 Well Fluid changed to Gas
2003-02-04 Well Mode changed to Flowing
2011-06-30 Well Fluid changed to Gas
2011-06-30 Well Mode changed to Pumping
2016-08-01 Well Fluid changed to Gas
2016-08-01 Well Mode changed to Suspended
2018-08-21 Well Fluid changed to Gas
2018-08-21 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-09-30 Perforation 1029.00 1030.20 14
1997-09-30 Perforation 1031.00 1032.20 14
1997-10-03 Packing Device Capped w/Cement 1012.00 1020.00 0
1997-10-03 Perforation 911.00 913.80 14
1997-10-03 Perforation 914.40 915.50 14
1997-10-03 Perforation 917.00 918.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 6086 0.0 0.0 0.0
1999 8665 0.0 0.0 0.0
2000 8766 0.0 0.0 0.0
2001 8545 0.0 0.0 0.0
2002 7196 0.0 0.0 0.0
2003 4280 0.0 0.0 0.0
2004 5086 0.0 0.0 0.0
2005 5864 0.0 0.0 0.0
2006 8542 0.0 0.0 0.0
2007 6870 0.0 0.0 0.0
2008 5009 0.0 0.0 0.0
2009 5354 0.0 0.0 0.0
2010 5712 0.0 0.0 0.0
2011 5025 0.0 0.0 0.0
2012 3389 0.0 0.0 0.0
2013 2680 0.0 0.0 0.0
2014 8314 0.0 0.0 0.0
2015 3020 0.0 0.0 0.0
2016 1730 0.0 0.0 0.0
2018 2858 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References